Title Page
1.0 Site Information
-
Date and Time
-
Worksite Location including start and finish KM:
-
Location of work in rail corridor?
- In Cess (or off track)
- On Track (in danger zone)
-
Description of work being carried out?
-
Discipline
- Civil
- Electrical
- Signal
- Other
2.0 Induction
-
Safety induction given to auditor(s)?
-
PWB form used is current?
-
PWB form properly compiled with all fields completed?
-
All signatures shown on PWB form?
-
WPP form current?
-
WPP form properly compiled with track diagram showing work areas, protection arrangements and safe areas?
-
All persons have appropriate PPE?
-
Emergency evacuation procedures explained?
-
Detonator register observed?
-
Remarks/comments:
3.0 Worksite Protection Details
-
Protection Officer's (PO) name:
-
What worksite protection is in use?
- LPA
- TOA
- TWA
- CSB
- Lookout Working
- Outside danger zone
-
What adjacent line protection is in use?
- LPA
- TOA
- TWA
- CSB
- Lookout Working
- Outside danger zone
4.0 Protection details LPA
-
Safe Notice circular notice?
-
Detonators, red flags/lights at both ends of possession or 2500m from worksite as required by network rules?
-
Protecting signals placed at stop with blocking facilities applied?
-
Remarks / Comments:
5.0 Safeworking Documentation
-
Are the current Work Method Statements / Safe Work Breakdowns on site?
-
If no, give details:
-
Have the workers been briefed on, and are they up to date with any changes to the relevant WMS/SWB?
-
If no, give details:
-
Remarks / Comments:
6.0 Protection Officer's Diary and Log
-
Has the Protection Officer compiled the Protection Officer's Diary (POD) and the Protection Officer's Log (POL), where required?
-
Remarks / Comments:
7.0 General Summary
-
Has a Worksite Protection Plan or similar document been compiled and signed by all relevant persons?
-
Was the Worksite Protection Plan reviewed as part of the pre work brief?
-
Can workers demonstrate knowledge of Work Method Statement / Safe Work Breakdown?
-
Can workers demonstrate knowledge of the Worksite Protection Plan?
-
Has the site induction register been completed correctly?
-
Do controls listed in the Pre Work Brief appear on the Worksite Protection Plan (eg safe places)?
-
Was a Pre Work Briefing form completed and signed by site workers?
-
Has the latest version of Pre Work Brief form used? (As per ARTC website)
-
Were you as an observer inducted into the site?
-
Did you sign the Pre Work Brief form?
-
Can the workers identify the Safe Place?
-
Do the workers know who is the First Aid Officer?
-
Is the first aid kit(s) on hand and appropriately stocked?
-
Is the planning of the work adequate?
-
Is lighting adequate for activity?
-
Are holes/excavations barricaded?
-
Is perimeter of worksite guarded / fenced / gates secured?
-
Are amenities adequate?
-
Are detonators in storage or use within recommended shelf-life?
-
Remarks / Comments:
-
Auditor name:
-
Other persons involved (if required):