Information
-
Site conducted
-
Unit
-
Conducted on
-
Auditor
Coffee Audit - Overview
Coffee Process
-
Barista(s)
-
Was button 1 used for flushing?
-
Was the coffee ground correctly?
-
Was the coffee level, tamped (correctly) and wiped?
-
Was the timer in use?
-
Correct ROP? (18-22 sec for Espresso, 15 sec for Ristretto)
-
Was the steamer purged before steaming?
-
Was a thermometer in use?
-
Is milk being steamed correctly with the correct amount of air being injected?
-
Was the steamer wiped and purged after steaming?
-
Was the milk being steamed whilst coffee was extracting?
-
Was the milk poured correctly? (spout for latte, side for cappuccino)
-
Latte Check
-
Cappuccino Check
-
Americano Check
-
Flat White Check
-
Hot Choc Check
-
Mocha Check
-
Is the bar clean and free of coffee grounds?
-
Additional Photos
Pressure Check
-
Is the pump pressure between 8 - 10 Bar
-
Is the steam pressure between 0.9 - 1.1 Bar
Summary Comments
-
Additional comments (optional)