Title Page
-
Conducted on
-
Prepared by
-
Location
-
Shipment is completed and loading diagram available?
-
Total rack count matches the total rack count on the diagram?
-
Operator has all dock constraints installed for truck to be loaded?
-
Operator is loading the trailer via the diagram presented?
-
Operator is scanning the dock ID and rack serial properly and following process?
-
Total rack count scanned matches the loading diagram totals?
-
Load completed and pictures taken of the trailer completed? (Include 2 pictures - trailer # and the rear of the load)