Title Page
-
Project Number
-
Part Number
-
Customer
-
Date & Time
-
Part Description
-
Auditor
-
Location
-
Any noncompliance requires immediate notification of your supervisor
General Setup
-
1. Is a Project Book or Project clip boards with all required froms available at the work site?
Work
-
2. Are Work Instructions available at the site and adequate?
-
3. Are the Work Instructions approved by the customer?
-
4. Are the associates trained to the Work Instructions and is the acknowledgement sheet signed, dated, and verified?
-
5. Are associates following the Work Instructions?
-
6. Are Tally Sheets, Rework and/or Scrap tracking forms completed properly and legible?
-
7. Are the associates able to "keep up" with the pace without missing any inspection points?
-
8. Is BSCS the last to handle the parts?
-
List names of Associates Audited
Tools, Gauges
-
9. Are there any tools required to complete the job and are they available and being used?
-
10. Are there any gauges required and are they available, being use properly, and within question?
-
11. Are Quality Standards/Boundary Samples available that show accepted/rejected conditions? (parts, photographs, diagrams)
Product Identification
-
12. Are the correct parts in the correct container with the correct label?
-
13. Are witness marks being applied to the part?
-
14. Are witness marks applied after the inspection is complete? Are they in the right color and location?
-
15. Are the green stickers applied properly per BSCS and inspection Work Instructions?
Work Area
-
16. Are there designated areas for accepted and in-process parts and are nonconforming parts tagged with a reject tag?
-
17. Does the quantity of nonconforming parts on the tally sheets match that on the segregated nonconforming parts are?
-
18. Is the work are organized and neat? 5-S?
-
19. Are BSCS associates in appropriate attite (uniforms, PPE/Safety)
-
20. Is the work area meeting requirements per BSCS and the site?
-
21. Is the lighting sufficient to see defect?
-
22. Are shift communication processes working properly (shift passdown logs, communication boards, etc.) ?
Documents
-
23. Are ALL project related documents (i.e. Work Instructions & Forms) current and in agreement with the current Document Master List & Forms Master List for Revisions and Dates?
-
24. Are temporary work instructions in use easy to read, legible, signed or initialed, and dated by the proper Bluegrass authority, and less than 90 days old ?
-
25. Are Chronological Logs available and in use?
-
26. Do chronological Logs contain pertinent information (customer special requests, part issues, at risk situations, etc.) ?
-
27. Are all documents legible and easy to read? No white-out or scratch outs? Any "red line" corrections on any document must have initials and date less than 30 days old?
Site Specific Checks
-
Area for to be used for special site specific checks
Sign Off
-
Auditor's Name & Signature
-
Customer's Name & Signature