Title Page

  • Add media

  • BMP Inspection Report - Dry Detention Basin

  • Project Name

  • SWM Permit #

  • Conducted on

  • BMP Location
  • BMP Map #

  • Prepared by

  • This BMP is currently:

Inflow Pipes (Pipe or Swale)

  • Obstruction: vegetation/debris/sediment

  • Comment:

  • Erosion/Undercutting

  • Comment:

  • Displacement of fabric/rip rap

  • Comment:

  • Pipe Condition

  • Comment:

  • Other (describe)

  • Comment:

  • Photo: issues for Inflow Points

Forebay

  • Sediment accumulation (75% of original depth)

  • Comment:

  • Side slope erosion

  • Comment:

  • Invasive vegetation

  • Comment:

  • Other (describe)

  • Comment:

  • Photo: issues in Forebay

Main Treatment Area

  • Standing water (more than 5 days after storm)

  • Comment:

  • Sediment accumulation (75% of original depth)

  • Comment:

  • Plants are dead, diseased or dying (replace such plants as necessary per original approved construction plans)

  • Comment:

  • Bare soil/erosive gullies

  • Comment:

  • Invasive vegetation

  • Comment:

  • Other (describe)

  • Comment:

  • Photo : for main treatment area

Embankment

  • Erosion and/or loss of dam material

  • Comment:

  • Shrubs/trees present

  • Comment:

  • Animal burrows

  • Comment:

  • Grass cover is eroding/unhealthy

  • Comment:

  • Signs of seepage on downstream face

  • Comment:

  • Other (describe)

  • Comment:

  • Photos for Embankment

Outlet Device

  • Obstruction/clogging

  • Comment:

  • Erosion/undercutting

  • Comment:

  • Device Damage

  • Comment:

  • Other (describe)

  • Comment:

  • Photos for Outlet Device

Miscellaneous

  • Trash/debris

  • Comment:

  • Access

  • Comment:

  • Vandalism

  • Comment:

  • Fence Condition (if applicable)

  • Comment:

  • Fish/wildlife observations

  • Comments:

  • Signage (if applicable)

  • Comments:

  • Other (describe)

  • Comment:

  • Photos for miscellaneous

  • Additional Comments:

  • Inspectors Name

  • Pass or Fail

  • If any item is marked as "Work Needed", the entire BMP Inspection fails. Repairs, re-inspection and report must be completed and PASSED within 30 days.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.