Title Page

  • Location

  • Date

  • Serviced By

  • Serial Number

Service Checklist

  • Setup parts washer

  • Setup TOLTEQ fill Station

  • Visual inspection of Tool

  • Test for Direct shorts

  • Download memory and Erase

  • Vibration level tap test

  • Remove Housing Box connector from Uphole End

  • Sure Pulse Test

  • Pull

  • Hold

  • Base

  • Remove and clean Box connector and screen from downhole end

  • Remove bulkhead

  • Remove all o-rings

  • Visually inspect all components

  • Clean all components

  • Test Solenoid

  • Inductance Reading

  • Resistance Reading

  • Pressure Bulkhead Pressure Test - If Required

  • Test 1 @ 20,000psi

  • Test 2 @ 20,000psi

  • Test 3 @ 20,000psi

  • Reassemble and clean solenoid and piston

  • Reassemble electronics

  • Assemble Uphole end

  • Set stroke

  • Stroke Length

  • Pull

  • Hold

  • Base

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.