Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
What are the details of the Vessel Installation? (Gas, Vessel size, Serial number)
-
What are the details of the Vapouriser Installation? (Model number)
-
Does the vessel compound meet the requirements of AS1894-1997 including separation distances?
-
Is there adequate access for the tanker delivery?
-
Does the installation follow either of the standard drawings
- E205-1505_S1 Standard VIE Gas Supply UNREGULATED
- E205-1506_S1 Standard VIE Gas Supply REGULATED
-
Have the Vessel and Vapouriser been bolted down?
-
Has the correct orifice plate been installed for the correct gas and flow requirements?
-
Have the following signs/placards been erected?
- DANGER No Smoking
- WARNING Authorised Personnel Only
- HAZCHEM Sign
- No Parking Sign
-
Has all commissioning and handover documentation been completed?
-
Has the customer handover procedure been followed and recorded?
-
Has fixed installation pricing been used as detailed in SRM?