Title Page
-
Conducted on
-
Prepared by
-
Location
Instructions
-
Monthly Boiler System Chemical Analysis:
a) Apply all required PPE;
b) Complete all questions;
c) e-mail PDF report to supervisor
d) Record actions in FAST PM
Boiler System Detail
-
Building #:
-
Boiler Name / Number / Status (Lead/Lag):
-
Boiler Model #:
-
Boiler Serial #:
Boiler System Assessment
-
1) Review boiler chemical feeder pot operational?
-
Boiler Chemical feeder pot need refilling?
-
Record amount of chemical used to refill pot.
-
3) Test pH of boiler drain water; results exceed 6.5 pH?
-
Record results of drain water test.
-
4) Check Domestic Hot Water Boiler salt tank operational?
-
5) Is Domestic Hot Water Boiler salt tank on Honeywell equipment PM list?
-
If Domestic Hot Water Boiler salt tank is other vendor equipment, call CE dispatch, report service needed and record 'Jxxxx' work order #.
-
Salt replenish required?
-
Record amount of salt used to replenish tank (i.e. one bag, half bag, quarter bag, etc.)
-
Notes / Observations / Conditions as found.
-
Inspector / Tester Signature:
Untitled page