Information
-
Boots Chiller Swop out
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Audit Daily Report 1
- Area
-
Work Carried out
- Pack Landed
- Roof Pro Installed
- Penetrations Created
- Penetrations Fire Stopped
- High Level Cable Tray Installed
- Key Clamp RDS
- Key Clamp Pack
- Boxing in Complete
- Painting Complete
- Pipe Work Ongoing
- Pipe work complete
- RDS Installed
- Electrical Works ongoing
- Electrical Work Complete
- Scaffold installed
- Cable Tray/Hangers installed
- Data Cable Installed
- SWR Made off in board
- Ceiling tiles installed
- System pressure @ 8 bar
- location of where H&S file left
- Scaffolding Removed
- Area left clean and tidy
- Materials left in an organised manner and out of the way.
- Armaflex painted
-
Add media
-
Are there any issues?
-
- No PPE
- Pipe route blocked
- Contractors not turn up
- Electrics not connect to board
-
Area left clean and tidy and Handed over to store