Audit Title: Apartment Inspection
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- Roof
-
Flat Ref
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Flat Type
- Social
- Private
- Intermediate
-
Kitchen Type
- Alno
- Manhattan
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
Drawing ref:
-
Drawing:
First Fix: Install Ductwork to ( MVHR )
-
1: Ductwork set out to latest construction issued drawing.
-
2: Ductwork spigots set out to latest issue RCP.
-
3: Fresh air supply ductwork fully insulated.
-
4: Exhaust air ductwork fully insulated.
-
5: Ductwork clipping complies with DW144.
-
6: Fire collars to be installed on ductwork where it passes through all 30min corridor walls. ( As shown on fire strategy ).
-
7: Insulated spiral flex fitted to the 4 spigots within the MVHR cupboard with jubilee clips fitted to outer sleeve.
-
8: All flex outlets connected to ductwork spigot with jubilee clip.
-
9: All flex outlets to be covered and taped tight to the ductwork ready for second fix.
-
10: Ductwork connected to fresh air grille.
-
11: Ductwork connected to exhaust air grille.
-
Wates manager:
Installed Ductwork ( Kitchen Extract )
-
1: Ductwork set out to latest construction issued drawing.
-
2: Ductwork spigots set out to latest issue kitchen drawing.
-
3: Ductwork clipping complies with DW144.
-
4: Flex outlet for cooker hood connected to ductwork spigot with jubilee clip.
-
5: Flex outlet for cooker hood to be covered and taped tight to the ductwork ready for second fix.
-
6: Ductwork connected to exhaust air grille.
-
7: All materials to be returned to storage area and plot left tidy.
-
Wates manager:
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Inspected by sub-contractor.
-
Inspected by wates manager.