Information
-
Document No.
-
Audit Title: Apartment Inspection
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- Roof
-
Flat Ref
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Flat Type
- Social
- Private
- Intermediate
-
Kitchen Type
- Alno
- Manhattan
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
Drawing ref:
-
Drawing:
MVHR
-
1: Check all punch-louvre's have back locking nut and are adjustable
-
2: Set MVHR to trickle and adjust speed setting and punca louvres to achieve air velocities required. Confirm these are achieved.
-
3: Set MVHR to boost and adjust speed setting to meet required boost air volumes.
-
4: Confirm boost switch activates for all bathrooms / en-suites when the light is turned on.
-
5: Confirm boost turns off as soon as light is switched off.
-
6: All materials to be returned to storage area and the plot left clean and tidy.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Inspected by sub-contractor.
-
Inspected by wates manager.