Drawing ref:

  • Drawing:

Finals:

  • 1: Collect at 2nd fix materials for plot from stores.

  • 2: Visual check plot 100 %.

  • 3: Ensure switchgear is level and sitting flush to the wall. ( NOT RECESSED ).

  • 4: Fit all Faces plates.

  • 5: Fit towel rail and wire into connection plate.

  • 6: Fit smoke/heat detectors.

  • 7: Confirm correct layout of test sheet compiled on 2n fix.

  • 8: All cables dressed neatly and tied in horizontally and vertically at 600mm minimum.

  • Note sheet 1:

  • Note sheet 2:

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.

  • Inspected by sub-contractor.

  • Inspected by wates manager.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.