Information

  • Document No.

  • Report Conducted on

  • Report Completed by:

  • Cabloc number (Off ground only)

  • Harness number (Off ground only)

Ground up level 1 and 2 bases

Trapeze

Trapeze 1

  • Select date

Components inspected

  • Anchor

  • Bar

  • Eye bolts

  • Ladders/steps

  • Lap splices

  • Pole/platform

  • Running blocks

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Stays

  • Activity base shelter

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Trapeze 2

  • Select date

Components inspected

  • Anchor

  • Bar

  • Eye bolts

  • Ladders/steps

  • Lap splices

  • Pole/platform

  • Running blocks

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Stays

  • Activity base shelter

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Trapeze 3

  • Select date

Components inspected

  • Anchor

  • Bar

  • Eye bolts

  • Ladders/steps

  • Lap splices

  • Pole/platform

  • Running blocks

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Stays

  • Activity base shelter

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Trapeze 4

  • Select date

Components inspected

  • Anchor

  • Bar

  • Eye bolts

  • Ladders/steps

  • Lap splices

  • Pole/platform

  • Running blocks

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Stays

  • Activity base shelter

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Climb

Climb 1

  • Select date

Components inspected

  • Anchors

  • Bolts

  • Climb face

  • Holds

  • Lap-Splices

  • Safety bench/area

  • Belay bar

  • Activity base shelter

  • Wires/Ferrels

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Climb 2

  • Select date

Components inspected

  • Anchors

  • Bolts

  • Climb face

  • Holds

  • Lap-Splices

  • Safety bench/area

  • Belay bar

  • Activity base shelter

  • Wires/Ferrels

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Climb 3

  • Select date

Components inspected

  • Anchors

  • Bolts

  • Climb face

  • Holds

  • Lap-Splices

  • Safety bench/area

  • Belay bar

  • Activity base shelter

  • Wires/Ferrels

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Indoor climb

  • Select date

Components inspected

  • Anchors

  • Bolts

  • Climb face

  • Holds

  • Lap-Splices

  • Safety bench/area

  • Belay bar

  • Activity base shelter

  • Wires/Ferrels

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Jacobs Ladder

Jacobs Ladder 1

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Lap-splices

  • Poles

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Activity base shelter

  • Access ladder

  • Ground stays

  • Ladder wires/wire grips/Logs

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Jacobs Ladder 2

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Lap-splices

  • Poles

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Activity base shelter

  • Access ladder

  • Ground stays

  • Ladder wires/wire grips/Logs

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Jacobs Ladder 3

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Lap-splices

  • Poles

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Activity base shelter

  • Access ladder

  • Ground stays

  • Ladder wires/wire grips/Logs

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Jacobs Ladder 4

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Lap-splices

  • Poles

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Activity base shelter

  • Access ladder

  • Ground stays

  • Ladder wires/wire grips/Logs

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Jacobs Ladder 5

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Lap-splices

  • Poles

  • Safety area

  • Safety bench

  • Shackles

  • Shear reduction blocks

  • Activity base shelter

  • Access ladder

  • Ground stays

  • Ladder wires/wire grips/Logs

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Vertical challenge 1

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Shear reduction blocks

  • Ladder wires/wire grips/Logs

  • Ropes

  • Logs

  • Cargo nets

  • Crates

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Vertical challenge 2

  • Select date

Components inspected

  • Anchors

  • Eye bolts

  • Shear reduction blocks

  • Ladder wires/wire grips/Logs

  • Ropes

  • Logs

  • Cargo nets

  • Crates

  • Wires/Ferrels/Grips

Completion

  • Has any maintenance been carried out during the inspection?

  • Are there any specific areas which need to be monitored during next inspection?

  • Is there any future maintenance that will need to be carried out?

  • Is this base safe for use?

  • Inspected by:

Zipwires

Zip wires

Zip wire 1

  • Select date

Components Inspected

  • Anchors

  • Eye bolts

  • Ladders/steps/Rescue Ladder

  • Lap Splices

  • Platform

  • Poles

  • Pully/cycle system

  • Safety bench

  • Shackles

  • Activity base shelter

  • Stays

  • Wire 1 (left)

  • Wire 2 (right)

  • Trolley 1

  • Trolley 2

  • Ferrules/Wire grips

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Zip wire 2

  • Select date

Components Inspected

  • Anchors

  • Eye bolts

  • Ladders/steps/Rescue Ladder

  • Lap Splices

  • Platform

  • Poles

  • Pully/cycle system

  • Safety bench

  • Shackles

  • Activity base shelter

  • Stays

  • Wire 1 (left)

  • Wire 2 (right)

  • Trolley 1

  • Trolley 2

  • Ferrules/Wire grips

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Zip wire 3

  • Select date

Components Inspected

  • Anchors

  • Eye bolts

  • Ladders/steps/Rescue Ladder

  • Lap Splices

  • Platform

  • Poles

  • Pully/cycle system

  • Safety bench

  • Shackles

  • Activity base shelter

  • Stays

  • Wire 1

  • Trolley 1

  • Ferrules/Wire grips

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Zip wire 4

  • Select date

Components Inspected

  • Anchors

  • Eye bolts

  • Ladders/steps/Rescue Ladder

  • Lap Splices

  • Platform

  • Poles

  • Pully/cycle system

  • Safety bench

  • Shackles

  • Activity base shelter

  • Stays

  • Wire 1

  • Bungee stopper

  • Trolley 1

  • Ferrules/Wire grips

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Zip wire 5

  • Select date

Components Inspected

  • Anchors

  • Eye bolts

  • Ladders/steps/Rescue Ladder

  • Lap Splices

  • Platform

  • Poles

  • Pully/cycle system

  • Safety bench

  • Shackles

  • Activity base shelter

  • Stays

  • Wire 1

  • Bungee stopper

  • Trolley 1

  • Ferrules/Wire grips

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swings

Giant swing

Giant swing 1

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swing 2

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swing 3

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swing 4

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swing 5

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Giant swing 6

  • Select date

Components Inspected

  • Eye bolts

  • Lap splices

  • Poles

  • Safety Fence

  • Safety shed

  • Shackles

  • Stays

  • Swing bar

  • Trolley

  • Wires/ferrules/Wire grips

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseiling towers

Abseiling

Abseil 1

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil 2

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil 3

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil 4

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil 5

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil 6

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Abseil Cliff

  • Select date

Components Inspected

  • Tower steps

  • Anchors

  • Abseil Face

  • Activity base shelter

  • Safety area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Continuous rail tower

Continuous Rail

Continuous rail 1 (left)

  • Select date

Components Inspected

  • Poles

  • Ground stays

  • Tower steps

  • Eye bolts

  • Gate

  • Trollies

  • Climbing holds

  • Wires/ferrules

  • Lap splices

  • Ropes/Rope shackles

  • Running block

  • Platforms

  • Safety Bench

  • Anchors

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Continuous rail 2 (right)

  • Select date

Components Inspected

  • Poles

  • Ground stays

  • Tower steps

  • Eye bolts

  • Gate

  • Trollies

  • Climbing holds

  • Wires/ferrules

  • Lap splices

  • Ropes/Rope shackles

  • Running block

  • Platforms

  • Safety Bench

  • Anchors

  • Activity base shelter

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Low ropes

Low ropes

Low ropes 1

  • Select date

Components Inspected

  • Wires/ferrules/wire grips

  • Barrel

  • Eye bolts

  • Logs

  • Ropes/shackles

  • Safety bench

  • Tyres

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Low ropes 2

  • Select date

Components Inspected

  • Wires/ferrules/wire grips

  • Barrel

  • Eye bolts

  • Logs

  • Ropes/shackles

  • Safety bench

  • Tyres

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Low ropes 3

  • Select date

Components Inspected

  • Wires/ferrules/wire grips

  • Barrel

  • Eye bolts

  • Logs

  • Ropes/shackles

  • Safety bench

  • Tyres

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Low ropes 4

  • Select date

Components Inspected

  • Wires/ferrules/wire grips

  • Barrel

  • Eye bolts

  • Logs

  • Ropes/shackles

  • Safety bench

  • Tyres

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery

Archery

Archery 1

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery 2

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery 3

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery 4

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery 5

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Archery 6

  • Select date

Components Inspected

  • Safety shed

  • Shooting line

  • Range safety line

  • Range overshoot

  • Boss ( inc. elastic and pegs)

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Challenge course

Challenge course

Challenge course 1

  • Select date

Components Inspected

  • Safety shed

  • Beams/poles

  • Holds

  • Cargo nets

  • Tyres

  • Platforms

  • Wires/ferrules

  • Stays

  • Ropes

  • Safety play area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Challenge course 2

  • Select date

Components Inspected

  • Safety shed

  • Beams/poles

  • Holds

  • Cargo nets

  • Tyres

  • Platforms

  • Wires/ferrules

  • Stays

  • Ropes

  • Safety play area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Orienteering

Orienteering

Orienteering course 1

  • Select date

Components Inspected

  • Posts/clippers

  • Surrounding areas

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Orienteering course 2

  • Select date

Components Inspected

  • Posts/clippers

  • Surrounding areas

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Orienteering course 3

  • Select date

Components Inspected

  • Posts/clippers

  • Surrounding areas

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Sensory trail

Sensory trail

Sensory trail 1

  • Select date

Components Inspected

  • Staples

  • Rope

  • Steps/platform

  • Poles

  • Surrounding area/trees

  • Material on tree

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Sensory trail 2

  • Select date

Components Inspected

  • Staples

  • Rope

  • Steps/platform

  • Poles

  • Surrounding area/trees

  • Material on tree

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Sensory trail 3

  • Select date

Components Inspected

  • Staples

  • Rope

  • Steps/platform

  • Poles

  • Surrounding area/trees

  • Material on tree

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Puzzle park

Puzzle park

  • Select date

Components Inspected

  • Platforms

  • Ropes

  • Bosens chair

  • Island swap wires/ferrules

  • Wobbly ladder wires/ferrules

  • Running block

  • Ladder

  • Cargo nets

  • Poles/planks

  • Safety areas

  • Woodland area

  • Benches

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Survivor woods

Survivor woods

  • Select date

Components Inspected

  • Kit storage

  • Build logs

  • Fire pits

  • Solar still pits

  • Fire extinguisher (check service date and pressure)

  • Surrounding woodland

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles

Rifles

Rifles 1

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles 2

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles 3

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles 4

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles 5

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Rifles 6

  • Select date

Components Inspected

  • Straw bales

  • Pellet catchers

  • Gate/Latch

  • Flag

  • Safety bench

  • Rifle holders

  • Rifle security shelf

  • Fence

  • Shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Motor sports tracks

Motorsports

Quads 1

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quads 2

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quads 3

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quads 4

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quads 5

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quads 6

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Motorbikes track

  • Select date

Components Inspected

  • Tyre wall

  • Rake

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quad skills track

  • Select date

Components Inspected

  • Tyre wall

  • Gravel track

  • Rake

  • Ramps

  • Rumble strips

  • Fire extinguisher (in date and pressure)

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Quad trek track

  • Select date

Components Inspected

  • Grass track

  • Field area

  • Tyre walls

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Go kart track

  • Select date

Components Inspected

  • Tyre walls

  • Tarmac track

  • Safety area/shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Fencing

Fencing

Fencing (activity barn)

  • Select date

Components Inspected

  • Foil holders

  • Shelving

  • Barriers

  • Lights

  • Fencing area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Fencing (mansion house ball room)

  • Select date

Components Inspected

  • Foil holders

  • Shelving

  • Barriers

  • Lights

  • Fencing area

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Aroball

Aroball

Aroball 1 (right)

  • Select date

Components Inspected

  • Springs

  • Netting

  • Covers

  • Beds

  • Poles

  • Goals

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Aroball 2 (left)

  • Select date

Components Inspected

  • Springs

  • Netting

  • Covers

  • Beds

  • Poles

  • Goals

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Kayaks

Kayaking

Kayaks 1

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • Safety shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Kayaks 2

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • Safety shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Kayaks 3

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • Safety shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Kayaks 4

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • Safety shed

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Canoeing

Open canoeing

Open canoeing 1

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • River banks

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Open canoeing 2

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Boat rack

  • Paddle rack

  • River banks

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Open canoeing 3

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Safety shed

  • Boat rack

  • Paddle rack

  • River banks

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Open canoeing 4

  • Select date

Components Inspected

  • Water quality/clarity

  • Launch point

  • Bridge

  • Boat rack

  • Paddle rack

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Raft building

Raft build

Raft build 1, 2 and 3

  • Select date

Components Inspected

  • Water quality/clarity

  • Build area

  • Launch point

  • Boat rack

  • Paddle rack

  • Barrels/Logs

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Raft build 4

  • Select date

Components Inspected

  • Water quality/clarity

  • Build area

  • Launch point

  • Boat rack

  • Paddle rack

  • Barrels/Logs

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Raft build 5

  • Select date

Components Inspected

  • Water quality/clarity

  • Build area

  • Launch point

  • Boat rack

  • Paddle rack

  • Barrels/Logs

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

Swimming pool

Swimming pool

  • Lighting

  • Pool side

  • Pool cover

  • Pool alarm (test)

  • Pump auto shut off (test)

  • Lifeguard chair

  • Rescue equipment

  • Games equipment

  • Plant room PPE

Completion

  • Has any maintenance work been carried out during the inspection?

  • Are there any specific elements that need to be monitored during the next inspection

  • Is there any future maintenance that will need to be carried out?

  • Is the base safe for use?

  • Inspected by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.