Title Page
-
Job / Document No.
-
BP Gutter Survey (Enter Site Name):
-
City FM Limited / Bp Oil UK
-
Conducted on
-
Prepared by
-
Site Address Where The Audit Was Carried Out:
-
Additional Information If Required:
Gutter Survey
Equipment
-
Is the space vac in good condition with all parts including all safety accessories i.e. Barriers, RCD plug, cable tidy and has all equipment been PAT tested where required
Gutter Survey
-
Has a full gutter clean been carried out from ground level with the space vac and no further work is required
-
What work is remaining and why
-
Insert pictures if required:
-
What access equipment is required to complete
-
is this a job for CFM or outside contractors
-
Do you have any recommendations?
-
Insert general pictures here if required:
Additional Work
-
Any additional work completed (enter details)
-
Any NMPI reportable
SIGNATURES
-
Signature of Fabric Technician:
-
Signature of the Site Manager (deputy):