Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • PPM/Job Numbers

PIPED CABINETS

  • Carry out a full thorough leak detection of shop floor cases, pipework(where accessible) and cold room evaporators

  • Carry out a vacuum clean of all island drain pump motors and associated pipework - test drain away & visually inspect condition of waste pipework

  • Check and refit any dropped or loose kick plates and panels

  • Visually inspect lighting and associated fittings and fixings for operation and damages

  • Visually inspect bumper rails and glass ends for damage

  • Check and test all night blinds are operational, including holding clips and magnetic curtain stop ends

  • Check and inspect risers are free from damage and tighten/replace fixings/screws

  • Visually inspect all base plates and shelving are secure and in good clean condition

  • Check RDM panel for any new or historical alarm issues

INTEGRAL FIXTURES

  • Check control temperature and operation are within desired temperature /adjust as necessary

  • Inspect component condition and operation are as desired

  • check and clean condenser

  • Check and clean condensate tray including drain outlet and runaway

  • visually inspect lighting and isolator switches are operational

  • Check door seals /gaskets are in good condition

  • Inspect door hinges and door heaters / transformers are operational

  • Check and test local isolation including plug supply and secondary isolator

  • Check lighting operational

  • Inspect Discharge condensate pipework condition (If poor order, replacement)

Cold Rooms

  • Check evaporators are clean and free from dust and dirt

  • Check coils are clean and probes are correctly positioned

  • Check door release is operational

  • Check seals and gaskets are in good condition

  • Check drains are clear

  • Check flooring is in good safe condition

  • Check lighting is operational

  • Check isolation is correct and adequately labelled

Glazed Cold Room Door Checks

  • Check door seals for tears and damage. Order and replace and damaged seals

  • Check Doors retract automatically and tensioners are in good working order. Report any issues and order any required parts urgently

  • Check top and bottom hinge plates/pins for any signs of excessive wear. Report any issues and order parts required urgently. Isolate doors if necessary

  • Check all door handles are secure and in good working order. Report any damage and order required parts

Plant & Packs

  • Check all compressors are operational. Report any issues

  • Check all crankcase heaters are operational and connected

  • Carry out full leak test of all compressors, connections, shut off valves, condensers, pressure hoses etc. Repair and report any leaks found

  • Pressure Relief Valves- Check condition and and date of PRV

  • Check parameters and controls are adequately set

  • Check pipe clamps are of correct condition and no vibration is present

  • Check oil level/oil condition.

  • Check electrical components/contactors and overloads are in good operational condition. Tighten contacts and terminals. Replace and report any failed components

  • Clean components and internal housing

  • Check mains electrical isolation is functional and is good condition

  • Check and test condenser fan operation

  • Clean condenser coil using a pressure washer or OFN please provide before and after pictures

  • Ensure LP/HP switches are set correctly and functional

  • Check all panels and doors are interlocked/re-fixed correctly

  • Remove any debris from vicinity and ensure area is left clean and tidy

  • Ensure site is clear of any refrigerant cylinders. Report and submit cylinder collection form for uplift

Any Further Actions Required

  • undefined

  • undefined

Works Authorization

  • Site Personnel sign off. (City FM Technician)

  • BP Site Manager Sign off I confirm the works have been completed to my satisfaction and the work areas have been left safe and tidy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.