Title Page

  • Site conducted

  • Date

  • PPE Check

  • Location of the works

  • Job No.

  • Job description

  • Please upload a photo of the Work Authorisation Form (WAF)

  • No. of Workers

  • Safety Passport Checked

  • List additional / key hazards

  • Control Measures - Method Statement

  • Control Measure - Risk Assessment - General

  • Control Measure - Risk Assessment - Electrical

  • Control Measure - Risk Assessment - Fridge

  • Control Measure - Risk Assessment - Building

  • Control Measures - BP Golden Rules

  • Additional / key control measures

  • Has this clearance certificate been amended during the task

  • Please note what these changes are

  • Additional control measures for chemicals (included coshh assessments name)

  • A new clearance certificate is required if additional hazards emerge during the works. IF UNSAFE - STOP WORK!.

  • Site Personnel Authorisation. (City FM Technician) I confirm I have read and understood the constraints imposed by the Safety Method Statement and the precautions identified above and will ensure that the above work is carried out in accordance with them.

  • Forecourt Site Manager Confirmation I confirm that I have informed the contractor of the site emergency plan and other hazards outside their control e.g. other contractors, tanker deliveries etc.

  • Forecourt Site Manager Sign off I confirm the works have been completed to my satisfaction and the work areas have been left safe and tidy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.