Information
-
Document No.
-
Client
-
Audit Title
-
Conducted on
-
Conducted By
-
Location
SWMS, Work Environment and Conditions
-
Environment inspected for hazards and controls put in place to manage hazards - slips, trips and falls, uneven ground, dogs, cats, etc?
-
SWMS Available and Understood?
Systems/Standards/Procedures
-
Competence for task?
-
Perform Lock Out, Tag Out and confirm circuit is isolated and safe to work on.
Site Location and Condition Assessment
-
Where is control box located on the property?
-
Is screen panel display in good condition?
-
Is alarm board type 1 and needs replacing? If NO proceed to Site Task Completion Section below
-
Is integrated circuit chip inserted correctly? ie notch must be on left hand side.
-
DIP switch position - UP UP DOWN (UUD)
Site Task Completion
-
Alarm board type on site departure, type 1, 2, or 3
-
Board Type Photo
-
Conduct de isolation of energy to power board and site left in safe condition?