Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Are the correct type of bricks been used

  • Is the mortar bed consistent at 10 mm (+/- 2 mm) and correct colour

  • On the movement joints are channels and ties installed either side at 150 mm

  • Are the brick ties installed correct every 6 courses and every 3 courses on the reveals

  • Is the correct type of compressible material been used within the movement joints

  • Tywek membrane correct installed over weather defence boards

  • Are the rainscreen insulation panels correctly installed

  • Cavity trays and weep holes are installed as per specifications

  • Fire barriers are installed correctly

  • Is the brickwork courses plumb and level

  • Is the cavity void as per detail drawings

  • Comments

Sign off

  • Paul Simon Homes

  • Contractor

  • Building Control

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.