Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Are the correct type of bricks been used
-
Is the mortar bed consistent at 10 mm (+/- 2 mm) and correct colour
-
On the movement joints are channels and ties installed either side at 150 mm
-
Are the brick ties installed correct every 6 courses and every 3 courses on the reveals
-
Is the correct type of compressible material been used within the movement joints
-
Tywek membrane correct installed over weather defence boards
-
Are the rainscreen insulation panels correctly installed
-
Cavity trays and weep holes are installed as per specifications
-
Fire barriers are installed correctly
-
Is the brickwork courses plumb and level
-
Is the cavity void as per detail drawings
-
Comments
Sign off
-
Paul Simon Homes
-
Contractor
-
Building Control
-
Comments