Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Drawing/plan been provided by the manufacturer

  • 10 mm minimum nominal gap between units

  • Where shims have been installed, maximum thickness not to be excedeed

  • Correct size fixings used as per the manufacturer instructions

  • Fixings have been checked and torqued to specs

  • Comments

Sign off

  • Paul Simon Homes site manager

  • Contractor represantive

  • Building control

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.