Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Contractor
-
Supervisor
-
Plot/Level nr
First fix
-
Conducted on
-
Fixing of metal base track
-
Fixing of metal head track
-
Fixing of metal studs
-
Walls boarded one side only
-
Install structure noggings (if aplicable)
-
Walls check for plumb and any defects
Signed on behalf of Paul Simon Homes First fix
-
Add signature
-
Select date
Second fix
-
Insulation installed to walls (if applicable)
-
Walls closed - boarded both sides
-
Metal grid for suspended ceilings installed
-
Insulation to ceilings installed (if aplicable)
-
Ceiling boarded
Signed on behalf of Paul Simon Homes Second fix
-
Add signature
-
Select date
Finishes
-
Beading installed
-
Tape and jointing
-
All surfaces checked and to satisfactory standards
Sign off at completion of works
-
Signed on Behalf of SCR interiors
-
Select date
-
Signed on behalf of Paul Simon Homes
-
Select date