Partition QA first fix
-
Setting out correct?
-
Specification correct ?
-
Door Opening and jambs and heads correct.?
-
Wall type correct ?
-
Fixings at correct centres ?
-
Apertures formed correctly and lined if required ?
-
Hand over for 1st fix M&E.
-
Snags to be rectified, photos attached
-
Works accepted by client/ builder
Noggins marked by others
-
Noggins marked by others
-
Noggins installed as per marks
-
Correct height, width and depth of noggin used
-
Hand back to M&E
All services installed and handover to measom
-
Electrical
-
Mechanical
Measom 2nd fix
-
Handover received from previous trades
-
Correct screw centres
-
Bottom and top of board screwed to maintain centres
-
Insulation-correct type and fixed correctly if required?
-
Penetrations neat and within tolerance ?
-
No visible damage to boards.
-
Handover.
Tape and joint.
-
Check for damage and repair
-
Paper tape used to internal corners.
-
Externals have corner beads fitted correctly.
-
All reveals and columns square.
-
1coat of filler and 2 coats of joint cement used.
-
Top coat and sanding done to a good standard.
-
Handover to next trades.