Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Are the windows installed as per drawings
-
Are the windows free of damages (no scratches, dent etc.)
-
Is the EPDM the correct type and installed (as per approved specification)
-
Are the correct type of brackets used as per specification
-
Are the correct type of screws being used as per manufacturer specification
-
Has the windows been protected internal and external
-
Comments
Sign off
-
Paul Simon Homes
-
Contractor
-
Building Control
-
Comments