Title Page
-
Documents received on
-
Assessment completed on
-
Assessed by
-
Contractors name
-
Hackney Estate name
-
Design pack received?
-
Is sufficient information provided in the design pack to allow verification of RAMS?
-
Does the design pack contain the following:
-
Detailed cable routes and installation method statements
-
Detailed splitter locations and installation method statements
-
Equipment technical specifications
-
Detailed civil work plans and method statements for digging/streetworks (if required)
-
Has the findings of the most recent FRA for each block been taken into consideration?
-
Are installation methods and routes clearly identified and consideration given to fire safety (e.g. fire stopping, cable ties etc?)
-
Where fire stopping is required does the document indicate 3rd party fire stopping accreditation?
-
Is appropriate cable fire rating classification provided? (EuroClass Cca s1b d2 a2 for reaction to fire)
-
Is asbestos information sufficient for the type of works proposed?
-
Where applicable is the R&D survey requirement identified?
-
Is asbestos awareness training identified as a minimum requirement for all operatives?
-
Are the RAMS specific to the estate/project?
-
Does the RAMS provide sufficient information on how Works at Height will be controlled?
-
Where applicable is Abseiling sufficiently covered in RAMS including requirements for specialist training?
-
Are welfare provisions detailed in the RAMS?
-
Are details of safety signage provided in RAMS
-
Is there a detailed explanation of how H&S matters will be communicated with the residents?
-
Are Covid 19 control measures clearly identified?
-
Is communication with residents considered and timescales specified ?
-
Is evidence of operatives competency provided within RAMS or Design Pack?
-
Are emergency procedures sufficiently detailed in the documents provided?
-
Is housekeeping and site security sufficiently detailed in the documents provided?
-
Is noise and vibration sufficiently detailed in the documents provided?
-
Is risk of excavation considered and control measures detailed in the documents provided?
-
Has ASB been considered as a hazard with controls identified to protect employees?