Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administration
-
Orientations conducted to new hires.
-
Labor Posters, First Aid Kit, Eye Wash, Map and Phone Number of nearest Medical facility posted.
-
APP on site. Site Safety Specific Submitted by Subcontractors.
-
Daily JHA/Pre-Tasks and Weekly Safety Meeting and Tool Box Talk done this week.
-
Visitor PPE Available.
-
OSHA 300 Log Posted (February 1 through April 30)
-
SDS's Available for chemical products present at this site.
-
Weekly Job Site Safety Inspection performed.
P.P.E
-
Safety Glasses worn by all employees as required.
-
Hard Hats worn by all employees as required.
-
High Visibility Vest/Shirt/Hoodies worn by employees as required.
-
Gloves worn by employees as required.
-
Construction Grade Boots worn by employees as required.
-
Hearing Protection worn at high noise levels.
-
Face Shields worn as required depending on task.
-
Respirator worn by employees as required depending on task.
Electrical Safety and Lighting.
-
Electrical Cords in good condition and protected from traffic.
-
GFCI in use.
-
Adequate Lighting.
-
Electrical Room/ Boxes Protected. Signs in place.
-
Lock Out/Tag Out in place if needed.
Fall Protection
-
Fall Protection Plan signed by all employees available on site.
-
Employees have been trained on the proper use of Fall Protection Equipment.
-
Fall Protection provided at 4' high.
-
Exterior/Interior guard rails properly setup.
-
Warning Line System properly setup.
-
Floor and Wall openings protected.
-
Anchoring Points adequate. Anchors installed properly.
-
Fall Protection PPE inspected daily.
-
Overhead Protection in place.
-
Stairs, ramps, walkways protected.
Housekeeping
-
Work Areas Clean and Sanitary.
-
Slip, Trip and Fall Hazards removed.
-
Aisles, Hallways, Stairwells and Walkways clear.
-
Impalement/Rebar protection in place.
Ladders.
-
Ladders inspected and in good condition.
-
Ladders properly setup and secured top and bottom.
-
Ladders being used properly by employees.
Scaffolds.
-
Have all employees been trained in the proper use of scaffolds.
-
Scaffolding inspected daily and verified on Green Tag by the Competent Person.
-
Guard Rails, bracing, Mud Sills, Plates, Jack Screws, Planking installed properly.
-
Scaffold properly secured to structure and proper base to height ratio present.
Forklift, Scissor and Boom Lifts.
-
Equipment inspected daily and documented before work begins.
-
Employees trained to operate Forklift, Scissor/Boom Lifts.
-
Fall Protection PPE in place when operating a boom lift.
Hand and Power Tools.
-
Cords in good condition.
-
Tool in good condition.
-
Proper tool for the job.
-
Guards in place.
-
Tools inspected.
Crane/Rigging/Hoisting.
-
Operator Certified. Crane paper work and maintenance records in place.
-
Qualified rigger and signal person verified.
-
Tag Lines in use. Loads properly secured. Rigging inspected.
Environmental.
-
Asbestos/Silica/Lead present.
-
Employee awareness training.
-
Silica dust controlled if present.
Excavations/Trenching.
-
Daily Inspections documented.
-
Competent person present.
-
Sloped/Benched/Shored.
-
Perimeter protected/Barricades.
Confined Space.
-
Employees have been trained in Confined Space.
-
Verified Non Permit or Permit Required Confined Space.
-
Documentation in place as required.
-
Supervisor/Attendant/Entrant clearly defined.
-
Atmospheric testing/conditions checked. Ventilation. Communication protocol. Regular Inspections.
-
Rescue Plan and Emergency numbers in place.
Hot Work /Fire Prevention/Protection.
-
Hot Work Permit in place. Welding, torching, burning.
-
Fire Extinguishers inspected. Adequate number of Fire Extinguishers.
-
Fire Watch when applicable.
Site/Public Protection.
-
Perimeter fences available.
-
Public Protection Signage.
-
Falling Object Protection.
Notes/Comments
-
Comments/Notes/Suggestions.
-
Signature.
-
Add media