Information

  • Document No.

  • Audit Title

  • Client

  • Location
  • Conducted on

  • Prepared by

1. Intergrated management system

1.1 General Requirements

  • 1.1.1 Is the project specific Quality Plan available?

  • 1.1.2 Is the project specific Environmental Plan available?

  • 1.1.3 Are project specific ITP's available?

1.2 Document Requirements

  • 1.2.1 Are the relevant QUESH forms available for use?

  • 1.2.2 Is there a copy of the IMS available for reference (electronic).?

  • 1.2.3 Are the ITP documents being used?

1.3 Control of Documents

  • 1.3.1 Are only the controlled documents in the Quality Plan being used?

  • 1.3.2 Are only the the controlled documents in the Environmental Plan being used?

1.4 Control of Records

  • 1.4.1 Are the completed records being kept correctly so that they auditable?

  • 1.4.2 Are there any records of Environmental Tool Box Talks?

  • 1.4.3 Are the completed snagging sheets available?

  • 1.4.4 Are the completed handover sheets available?

  • 1.4.5 Are the stage completed ITP records available?

  • 1.4.6 Are clients signing off ITP / handover sheets?

  • 1.4.7 Have the traffic delivery records been sent to the client?

1.5 Environmental Aspects

  • 1.5.1 Is the delivery packaging being utilised to recover the installed joinery?

  • 1.5.2 Is all of the protection being used LPS 1207 fire rated?

  • 1.5.3 Is dust extraction being used on cutting equipment?

  • 1.5.4 Is there any noisy areas that need signage and if so is it being used?

  • 1.5.5 Is waste being separated into correct waste streams?

2. Management Responsibility

2.1 Management Commitment

  • 2.1.1 Has the Project Manager read and signed the Quality Plan?

  • 2.1.2 Has the Close-out Manager / Supervisor been inducted on the contents of the Quality Plan?

2.2 Customer Requirements

  • 2.2.1 Are the clients environmental project requirements being met (i.e. LEED, BREEAM, SKA etc.)

  • 2.2.2 Has the clients correct sustainable timber standards been met?

  • 2.2.3 Is the waste minimisation targets being adhered to?

  • 2.2.4 Are the noise minimisations requirements being managed (i.e. Noisy work restrictions)

2.3 Statutory Notices

  • 2.3.1 Is the IMS policy being displayed?

  • 2.3.2 Is the insurance certificate displayed?

2.4 Project Specific Quality & Environmental Requirements

  • 2.4.1 Are the Quality objectives being met?

  • 2.4.2 Are the environmental objects being being met?

  • 2.4.3 Are the Quality inspections being managed correctly?

  • 2.4.4 Are the environmental inspections being managed correctly?

2.5 Internal Communication

  • 2.5.1 Have all operatives been made aware of the Quality Plan?

  • 2.5.2 Have all operatives been made aware of the Environmental Plan?

  • 2.5.3 Have all operatives been made aware of the ITP procedures?

  • 2.5.4 Have stage sign of ITP's been explained to installers?

  • 2.5.5 Have Environmental Tool Box Talks been undertaken?

  • 2.5.6 Have waste segregation been communicated to all operatives?

2.6 Management Review

  • 2.6.1 Have Contract Management checked Quality Plan is being followed?

  • 2.6.2 Have Contract Management checked Environmental Plan is being followed?

  • 2.6.3 Have Contract Management checked ITP's are being followed?

  • 2.6.4 Have Contract Management checked ITP system is being followed?

  • 2.6.5 Has Quality Plan Review been carried out?

  • 2.6.6 Has Environmental Plan review been carried out?

  • 2.6.7 Has ITP review been carried out?

2.7 Resource Management

  • 2.7.1 Has a quality close out responsibility operative been assigned?

  • 2.7.2 Have labourers been given clear instruction on delivery requirements?

  • 2.7.3 Has the client provided the required welfare facilities?

  • 2.7.4 Has the client provided the required waste segregation facilities?

  • 2.7.5 Has the client provided an environmentally safe working environment?

2.8 The Product

  • 2.8.1 Does the sustainable timber purchased meet the specification requirements?

  • 2.8.2 Has the product been inspected before arriving on site?

  • 2.8.3 Is there a quality inspection sticker on the product?

  • 2.8.4 Has the product been labelled correctly?

  • 2.8.5 Has the product been checked and signed for by a receiving operative?

  • 2.8.6 Is the storage sufficient to allow supplied products to be stored without risk of damage?

  • 2.8.7 Has the product been stored in a manner as to avoid damage?

  • 2.8.8 Is the product being stored have the required fire protection standard?

  • 2.8.9 Has the product been protected after installation against accidental damage?

2.9 Measurement Analysis and Improvement

  • 2.9.1 Does the installation (to-date) comply with the expected Quality Standard?

  • 2.9.2 Are the environmental requirements (to-date) being met?

  • 2.9.3 Have TBT's been undertaken?

  • 2.9.4 Have TBT's been issued to client?

  • 2.9.5 Have B&C had any quality rejections?

  • 2.9.6 Have timber products been delivered direct to site that did not meet sustainability standards required?

  • 2.9.7 Has the clients team issued any non-conformance reports?

3.0 Corrective Actions

  • 3.0.1 CORRECTIVE ACTION

3.1 Preventive Actions

  • 3.1.1 PREVENTIVE ACTION

  • Signature of Auditor

Summary

Comments

  • Comments

Findings

  • Details of nonconformances identified

  • Nonconformances
  • Location / Department / Document

  • Clause references from the Standard(s)

  • Details of the nonconformance

  • Details of Observations identified

  • Observations
  • Location / Department / Document

  • Clause references from the Standard(s)

  • Details of the observation

Auditees

  • Names of Auditees

  • Auditees
  • Name

  • Position

Signatures

  • Auditor

  • Company Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.