Information
-
Document No.
-
Audit Title
-
Client
-
Location
-
Conducted on
-
Prepared by
1. Intergrated management system
1.1 General Requirements
-
1.1.1 Is the project specific Quality Plan available?
-
1.1.2 Is the project specific Environmental Plan available?
-
1.1.3 Are project specific ITP's available?
1.2 Document Requirements
-
1.2.1 Are the relevant QUESH forms available for use?
-
1.2.2 Is there a copy of the IMS available for reference (electronic).?
-
1.2.3 Are the ITP documents being used?
1.3 Control of Documents
-
1.3.1 Are only the controlled documents in the Quality Plan being used?
-
1.3.2 Are only the the controlled documents in the Environmental Plan being used?
1.4 Control of Records
-
1.4.1 Are the completed records being kept correctly so that they auditable?
-
1.4.2 Are there any records of Environmental Tool Box Talks?
-
1.4.3 Are the completed snagging sheets available?
-
1.4.4 Are the completed handover sheets available?
-
1.4.5 Are the stage completed ITP records available?
-
1.4.6 Are clients signing off ITP / handover sheets?
-
1.4.7 Have the traffic delivery records been sent to the client?
1.5 Environmental Aspects
-
1.5.1 Is the delivery packaging being utilised to recover the installed joinery?
-
1.5.2 Is all of the protection being used LPS 1207 fire rated?
-
1.5.3 Is dust extraction being used on cutting equipment?
-
1.5.4 Is there any noisy areas that need signage and if so is it being used?
-
1.5.5 Is waste being separated into correct waste streams?
2. Management Responsibility
2.1 Management Commitment
-
2.1.1 Has the Project Manager read and signed the Quality Plan?
-
2.1.2 Has the Close-out Manager / Supervisor been inducted on the contents of the Quality Plan?
2.2 Customer Requirements
-
2.2.1 Are the clients environmental project requirements being met (i.e. LEED, BREEAM, SKA etc.)
-
2.2.2 Has the clients correct sustainable timber standards been met?
-
2.2.3 Is the waste minimisation targets being adhered to?
-
2.2.4 Are the noise minimisations requirements being managed (i.e. Noisy work restrictions)
2.3 Statutory Notices
-
2.3.1 Is the IMS policy being displayed?
-
2.3.2 Is the insurance certificate displayed?
2.4 Project Specific Quality & Environmental Requirements
-
2.4.1 Are the Quality objectives being met?
-
2.4.2 Are the environmental objects being being met?
-
2.4.3 Are the Quality inspections being managed correctly?
-
2.4.4 Are the environmental inspections being managed correctly?
2.5 Internal Communication
-
2.5.1 Have all operatives been made aware of the Quality Plan?
-
2.5.2 Have all operatives been made aware of the Environmental Plan?
-
2.5.3 Have all operatives been made aware of the ITP procedures?
-
2.5.4 Have stage sign of ITP's been explained to installers?
-
2.5.5 Have Environmental Tool Box Talks been undertaken?
-
2.5.6 Have waste segregation been communicated to all operatives?
2.6 Management Review
-
2.6.1 Have Contract Management checked Quality Plan is being followed?
-
2.6.2 Have Contract Management checked Environmental Plan is being followed?
-
2.6.3 Have Contract Management checked ITP's are being followed?
-
2.6.4 Have Contract Management checked ITP system is being followed?
-
2.6.5 Has Quality Plan Review been carried out?
-
2.6.6 Has Environmental Plan review been carried out?
-
2.6.7 Has ITP review been carried out?
2.7 Resource Management
-
2.7.1 Has a quality close out responsibility operative been assigned?
-
2.7.2 Have labourers been given clear instruction on delivery requirements?
-
2.7.3 Has the client provided the required welfare facilities?
-
2.7.4 Has the client provided the required waste segregation facilities?
-
2.7.5 Has the client provided an environmentally safe working environment?
2.8 The Product
-
2.8.1 Does the sustainable timber purchased meet the specification requirements?
-
2.8.2 Has the product been inspected before arriving on site?
-
2.8.3 Is there a quality inspection sticker on the product?
-
2.8.4 Has the product been labelled correctly?
-
2.8.5 Has the product been checked and signed for by a receiving operative?
-
2.8.6 Is the storage sufficient to allow supplied products to be stored without risk of damage?
-
2.8.7 Has the product been stored in a manner as to avoid damage?
-
2.8.8 Is the product being stored have the required fire protection standard?
-
2.8.9 Has the product been protected after installation against accidental damage?
2.9 Measurement Analysis and Improvement
-
2.9.1 Does the installation (to-date) comply with the expected Quality Standard?
-
2.9.2 Are the environmental requirements (to-date) being met?
-
2.9.3 Have TBT's been undertaken?
-
2.9.4 Have TBT's been issued to client?
-
2.9.5 Have B&C had any quality rejections?
-
2.9.6 Have timber products been delivered direct to site that did not meet sustainability standards required?
-
2.9.7 Has the clients team issued any non-conformance reports?
3.0 Corrective Actions
-
3.0.1 CORRECTIVE ACTION
3.1 Preventive Actions
-
3.1.1 PREVENTIVE ACTION
-
Signature of Auditor
Summary
Comments
-
Comments
Findings
-
Details of nonconformances identified
Nonconformances
-
Location / Department / Document
-
Clause references from the Standard(s)
-
Details of the nonconformance
-
Details of Observations identified
Observations
-
Location / Department / Document
-
Clause references from the Standard(s)
-
Details of the observation
Auditees
-
Names of Auditees
Auditees
-
Name
-
Position
Signatures
-
Auditor
-
Company Representative