BTS Fire Alarm System Commissioning Certificate

  • Customer name:

  • Job Number:

  • Site Name:

  • Visit Start Date:

  • Visit Completion Date:

  • I/We being the competent person(s) responsible (as indicated by my/our signature(s) ) for the commissioning of the Fire Alarm System, particulars of which are set out below, CERTIFY that the said work for which I/We have been responsible complies to the best of my/our knowledge and belief with the recommendations of clause 39 of BS5839-1 2013, except for any variations, if any, stated in this certificate.

The extent of liability of the signatory is limited to the system described below.

  • Extent of system covered by this certificate:

  • Variation from the recommendations of Clause 39 of BS5839-1:2010 ( see BS5839-1:2010, Clause 7:

  • Any known variations from the recommendations of Section 4 and Clause 39 of BS5839-1:2013 or the listed specification are detailed on variation sheets from: To. :

Commissioning

  • All equipment operates correctly

  • Installation work is, as far as can reasonably ascertained of an acceptable standard.

  • The entire system has been inspected and tested in accordance with the recommendations of Clause 39.2c of BS5839-1:2013

  • The system performs as required by the specifications prepared by the nominated person shown below a copy of which I/We have been given:

  • Taking into account the guidance contained in section 3 of BS5839-1:2013, I/We have not identified any obvious potential for an unacceptable rate of false alarms.

  • The documentation described in Clause 40 of BS5839-1:2013 has been provided to the user

  • The following work should be completed as indicated below, (Before/After or N/A) the system becomes operational:

  • Indicate here if Work to be carried out:

  • The following potential causes of false alarms should be considered at the time of the next service visit:

  • Indicate here potential causes of possible false alarms to be considered on next service visit to be checked:

  • Before the system becomes operational, it should be soak tested in accordance with the recommendations of 35.2.6 of BS5839-1:2013 for a period of: (that is indicated below). ( Enter a period of 1 week, such period as required by the specification, or such period as recommended by the signatory to this certificate, whichever is the greatest, or delete if not applicable.) Period of soak test is:

  • Commissions engineers name:

  • Commissioning engineers Signature:

  • Date:

  • Building Technology Services, 119a Derby Street, Burton-on-Trent, DE14 2LE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.