Building Technology Services
-
Site Name
-
Conducted on
BTS Door Access Control- Commissioning Certificate
Customer Overview
-
Job Number
-
Site Name:
-
Site Address:
Door Controller Checks Secondary Voltage output
Door Controller Checks Voltage at PSU Primary
Door Controller Checks Current (mA) at PSU Secondary output
Access Control -Checks
-
Check the installation, location and siting of the equipment and devices against the system record.
- Yes
- No
- N/A
-
Carry out visual inspection of all major components:
- Yes
- No
- N/A
-
Check all power supply voltages and charging rates at door controllers and lock PSU's inc mains voltages. Check battery condition and age.
- Yes
- No
- N/A
-
Check operation of the reader and LED status for valid, invalid cards and reports.
- Yes
- No
- N/A
-
Check operation of keypads if fitted i.e. valid and invalid pin numbers.
- Yes
- No
- N/A
-
Check operation of door contacts ( if fitted ) correct indication of door forced and held open alarms
- Yes
- No
- N/A
-
Check control equipment in accordance with company procedure.
- Yes
- No
- N/A
-
Check the operation of any warning devices on the system.
- Yes
- No
- N/A
-
Check operation of electronic release and ensure unrestricted operation of door closure. Visibly inspect equipment and tighten any loose fittings, Maglocks etc.
- Yes
- No
- N/A
-
Check operation of egress button and emergency break glass operation.
- Yes
- No
- N/A
-
Check operation of alarm inputs/outputs.
- Yes
- No
- N/A
-
Check correct operation of PC Software and advise customer on backup of database where applicable.
- Yes
- No
- N/A
-
Verify remote operation of lock release from PC including no access or blocking.
- Yes
- No
- N/A
-
Check correct operation of ID badge and report printer ( if applicable ).
- Yes
- No
- N/A
-
Check system is fully operational and carry out any minor adjustments
- Yes
- No
- N/A
-
Resolve any customer questions and issues
- Yes
- No
- N/A
-
-
Photos of any Conditions actions named above
Engineers' Time Sheet Summary
-
Enter Date and Time arrived on site:
-
Enter Date and Time finished on site:
-
Number of on-site hours:
-
Number of travel hours:
Customer Acceptance:
-
Engineers Name: for and On behalf of BTS Fire & Security
-
BTS engineers signature
-
Customers Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.
-
Customer Job Title:
-
Customers Signature
Office use ONLY:
-
Closed:
-
Invoiced (where applicable):
-
Actioned by:
-
Date Closed: