Information
-
Client / Site Name:
-
Conducted on:
BTS Intruder Alarm Commissioning Certificate
Customer Overview
-
Job Number
-
Site Name
-
Site Address
Panel Checks
-
Transformer output voltage (vac)
-
Induced AC voltage (vac)
-
Auxiliary output voltage (vdc)
-
Battery charge voltage (vdc)
-
Battery charge current (a)
-
Battery load test (ah)
-
SAB test
Pre Open Panel Checks
-
Was your ID card shown?
-
Check logbook for any outstanding issues and record the details in the comments section of this form.
-
Was the ARC informed of your presence? (Please log times)
-
Enter time system was put on test
-
Has there been any problems or changes to the site?
-
Has a visual inspection been carried out of installation, location and siting of equipment against the specification
-
Do all detection devices operate correctly?
-
Does the system conform to the 'as fitted' document?
-
Have you checked bell delay (if programmed) and duration time?
Communication & Signalling Tests
-
Does the system have any method of signalling?
-
Test line sensing
-
PIN 1 - Fire
-
PIN 2 - PA
-
PIN 3 - Intruder
-
Test line sensing
-
PIN 1 - Fire
-
PIN 2 - PA
-
PIN 3 - Intruder
-
PIN 4 - Open & Close
-
PIN 5 - Zone Omitted
-
PIN 6 - Tamper
-
PIN 7 - Confirmed
-
PIN 8 - AC Fail
Closed Control Panel Checks
-
Has the system been left in customer mode?
-
Has a report of signalling tests been received?
-
Has the ARC been informed to reinstate response?
-
Time Off Test?
-
Are there any non-conformities, work carried out that requires documenting or extra works required:
-
Photos where required
-
Description
-
Update the log book and add details here
-
Condition report test:
- A - Good Working Conditions
- B - Below Standard
- C - Fail
- D - Critical, Life Safety
-
Conditions/Actions required on above section also add photos below where required:
-
Any photos add here for Condition report
Part Transactions:
-
Have parts been used?
-
List materials used including quantities, part description, serial numbers:
-
Are parts required?
-
List parts required including part numbers, voltages etc.
Engineers' Time Sheet Summary:
-
Enter Date and Time arrived on site:
-
Enter Date and Time finished on site:
-
Number of on-site hours:
-
Number of travel hours:
Customer Acceptance
-
Engineers Name
-
For and on behalf of BTS:
-
Customer Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.
-
Customer Job Title:
-
For and on behalf of the Customer:
Office use ONLY:
-
Closed:
-
Invoiced (where applicable):
-
Actioned by:
-
Date Closed:
BTS Company Details:
-
Building Technology Services, 119a Derby Street, Burton-on-Trent, DE14 2LE