Information

  • Client / Site Name:

  • Conducted on:

BTS Intruder Alarm Commissioning Certificate

Customer Overview

  • Job Number

  • Site Name

  • Site Address

Panel Checks

  • Transformer output voltage (vac)

  • Induced AC voltage (vac)

  • Auxiliary output voltage (vdc)

  • Battery charge voltage (vdc)

  • Battery charge current (a)

  • Battery load test (ah)

  • SAB test

Pre Open Panel Checks

  • Was your ID card shown?

  • Check logbook for any outstanding issues and record the details in the comments section of this form.

  • Was the ARC informed of your presence? (Please log times)

  • Enter time system was put on test

  • Has there been any problems or changes to the site?

  • Has a visual inspection been carried out of installation, location and siting of equipment against the specification

  • Do all detection devices operate correctly?

  • Does the system conform to the 'as fitted' document?

  • Have you checked bell delay (if programmed) and duration time?

Communication & Signalling Tests

  • Does the system have any method of signalling?

  • Test line sensing

  • PIN 1 - Fire

  • PIN 2 - PA

  • PIN 3 - Intruder

  • Test line sensing

  • PIN 1 - Fire

  • PIN 2 - PA

  • PIN 3 - Intruder

  • PIN 4 - Open & Close

  • PIN 5 - Zone Omitted

  • PIN 6 - Tamper

  • PIN 7 - Confirmed

  • PIN 8 - AC Fail

Closed Control Panel Checks

  • Has the system been left in customer mode?

  • Has a report of signalling tests been received?

  • Has the ARC been informed to reinstate response?

  • Time Off Test?

  • Are there any non-conformities, work carried out that requires documenting or extra works required:

  • Photos where required

  • Description

  • Update the log book and add details here

  • Condition report test:

  • Conditions/Actions required on above section also add photos below where required:

  • Any photos add here for Condition report

Part Transactions:

  • Have parts been used?

  • List materials used including quantities, part description, serial numbers:

  • Are parts required?

  • List parts required including part numbers, voltages etc.

Engineers' Time Sheet Summary:

  • Enter Date and Time arrived on site:

  • Enter Date and Time finished on site:

  • Number of on-site hours:

  • Number of travel hours:

Customer Acceptance

  • Engineers Name

  • For and on behalf of BTS:

  • Customer Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.

  • Customer Job Title:

  • For and on behalf of the Customer:

Office use ONLY:

  • Closed:

  • Invoiced (where applicable):

  • Actioned by:

  • Date Closed:

BTS Company Details:

  • Building Technology Services, 119a Derby Street, Burton-on-Trent, DE14 2LE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.