Information
-
Project No.
-
Project Name.
-
Conducted on
-
Prepared by
Traffic management
-
Permanent traffic speed through area
-
Risk rating
-
Workman Ahead Signs
-
Road Work Ahead Signs
-
Flashing Lights on Vechile
-
Spotter / Lookout Person
-
Vehicle parked between oncoming traffic and work site
-
Other
Site Hazards
-
Electrical Assets
-
Control Measures Taken
-
Overhead Powerlines<br>
-
Control Measures Taken
-
Rail / Tram Tracks
-
Control Measures Taken
-
Machinery / Heavy Plant
-
Control Measures Taken
-
Confined Spaces
-
Control Measures Taken
-
Trenches / Excavations
-
Control Measures Taken
-
Watercourses
-
Control Measures Taken
-
Uneven surfaces / disorderly worksites
-
Control Measures Taken
-
Fencing
-
Electric
-
Barbwire
-
Other
-
Control Measures Taken
-
Animals (eg. Dogs, snakes, cattle) Detail:
-
Control Measures Taken
-
Noise
-
Control Measures Taken
-
Working underneath structures / Overhead works in progress
-
Control Measures Taken
-
Extreme Temperatures:
-
Heat
-
Cold
-
Control Measures Taken
-
UV Radiation
-
Control Measures Taken
-
Fatigue
-
Control Measures Taken
-
Night Works
-
Control Measures Taken
-
Manual Handling (eg. Lifting drainage pits, carrying stations)
-
Control Measures Taken
-
Remote Work / One Person
-
Control Measures Taken
List any additional identified hazards:
-
Hazard:
Clearly Print Name:
-
Have all members of the work party reviewed the Daily JSA and understand their role in the safe completion of the work:
Name:
-
Add signature