Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Water Authority Validation Officer present?

  • Tap to enter information
  • Personnel

Site overview

  • Inspection carried out the following time

  • Select date

  • Principal Contractor

  • Sewermain Contractor

  • Is this an AoW or EDLP inspection?

  • Tap to enter information

MH's

  • MH Checked

  • Checked MH
  • MH No.

  • Distance from cover to top rung 600mm maximum.

  • Tap to enter information
  • Reason for being non-compliant

  • Class D cover in road reserve, class B cover in lots and reserves

  • Tap to enter information
  • Reason for being non-compliant

  • Bolt down cover provided if required.

  • Tap to enter information
  • Reason for being non-compliant

  • Cover level with surrounding surface

  • Tap to enter information
  • Reason for being non-compliant

  • Internal finish to MH good. Channel clean and free flowing. MH joint flush and no seals exposed/hanging. No ground water seepage.

  • Tap to enter information
  • Reason for being non-compliant

  • Inlet & outlet pipes finished flush with internal wall

  • Tap to enter information
  • Reason for being non-compliant

  • Comments...

  • Photos...

MS/IS

  • Checked MS/IS

  • MS/IS
  • MS/IS No.

  • Distance from cover to top of screw cap 100-150mm

  • Tap to enter information
  • Reason for being non-compliant

  • Class D cover in road reserve, class B cover in lots and reserves

  • Tap to enter information
  • Reason for being non-compliant

  • Cover stable & level with surrounding surface & centered

  • Tap to enter information
  • Reason for being non-compliant

  • Shroud central, not damaged, no gap under cover.

  • Tap to enter information
  • Reason for being non-compliant

  • Comments...

  • Photos...

Property Connections

  • Checked Property Connection

  • Connection
  • Connection Location?

  • Tie distance confirmed

  • Tap to enter information
  • Reason for being non-compliant

  • Marker peg and tape installed

  • Tap to enter information
  • Reason for being non-compliant

  • Comments...

  • Photos...

Trenches & Reinstatement

  • Trenches filled, level & reinstated satisfactorily?

  • Tap to enter information
  • Reason for being non-compliant

Site Demobilisation

  • Contractor has fully demobilised from site?

  • Tap to enter information
  • Reason for being non-compliant

Site Cleanup

  • Site is clean?

  • Tap to enter information
  • Reason for being non-compliant

Asset Commissioning

  • Sewermain has passed compliance testing?

  • Tap to enter information
  • Reason for being non-compliant

Abandoned Assets

  • Abandoned assets have been left as noted on the drawings?

  • Tap to enter information
  • Reason for being non-compliant

Sewermain is Operational

  • All works have been finalised and all temporary plugs have been removed?

  • Tap to enter information
  • Reason for being non-compliant

Other Observations

    Observation
  • Comments...

  • Photos...

  • Tap to enter information

MH's

  • MH Checked

  • Checked MH
  • MH No.

  • Cover level with surrounding surface. No settlement.

  • Tap to enter information
  • Reason for being non-compliant

  • No damage to cover or surround.

  • Tap to enter information
  • Reason for being non-compliant

  • Cover & surround seal to MH chamber/taper intact.

  • Tap to enter information
  • Reason for being non-compliant

  • No debris in channel and not holding water

  • Tap to enter information
  • Reason for being non-compliant

  • Is 3rd party damage or works likely to be the cause of any issues

  • Tap to enter information
  • Reason for being non-compliant

  • Comments...

  • Photos...

MS/IS

  • Checked MS/IS

  • MS/IS
  • MS/IS No.

  • Cover stable & level with surrounding surface. No settlement.

  • Tap to enter information
  • Reason for being non-compliant

  • Shroud central, not damaged, no gap under cover?

  • Tap to enter information
  • Reason for being non-compliant

  • No damage to cover or surround.

  • Tap to enter information
  • Reason for being non-compliant

  • Distance from cover to top of screw cap between 100-150mm.

  • Tap to enter information
  • Reason for being non-compliant

  • Is 3rd party damage or works likely to be the cause of any issues?

  • Tap to enter information
  • Reason for being non-compliant

  • Comments...

  • Photos...

Trench Reinstatement

  • Trench reinstatement is satisfactory?

  • Tap to enter information
  • Reason for being non-compliant

Site cleanup & demobilisation

  • Site cleanup & demobilisation is complete?

  • Tap to enter information
  • Reason for being non-compliant

Other Observations

    Observation
  • Comments...

  • Photos...

Summary

  • Other Comments...

  • Other Photos...

  • Safety Advisor

  • Site Representative

  • I confirm that all actions highlighted within this report have been completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.