Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Water Authority Validation Officer present?
Tap to enter information
-
Personnel
Site overview
-
Inspection carried out the following time
-
Select date
-
Principal Contractor
-
Sewer Contractor
-
All actions from previous inspection report completed
General
-
Is confined space entry required
Tap to enter information
-
Has permit to work been obtained
-
Minimum number of staff on site? (3)
-
Correct equipment I.e. signage, harness
-
BWC auditor has witnessed live entry form
-
Has pre testing been complete?
Tap to enter information
-
Witness
-
Date witnessed
Tap to enter information
-
Why was it not witnessed
-
A copy of the pretest paperwork received?
Ovality testing
-
Ovality testing conducted?
Tap to enter information
-
Deflection Tolerance (table 22.7)
-
Prover Outside Diameter (table G1)
-
Ball serial number
-
Circumference Tape Measure
-
Nominate lines tested by u/s & d/s MHs
-
Lines Tested
Line
-
Lines tested
-
Result
Vacuum Testing
-
Vacuum testing conducted?
Tap to enter information
-
Gauges
Gauge
-
Gauge Serial Number
-
Calibration date
-
Nominate MH numbers
-
Vacuum Testing Manholes & Lines
Manhole
-
Manholes & Lines
-
Time Started
-
kPa
-
Time Finished
-
Change in pressure
-
Result
Pressure Testing
-
Pressure testing conducted?
Tap to enter information
-
Gauges
Gauge
-
Gauge Serial Number
-
Gauge Calibration Date
-
Nominate lines tested by u / s & d / s MHs
-
Pressure Testing Lines
Line
-
Lines
-
Time Started
-
kPa
-
Time Finished
-
Change in pressure
-
Result
Summary
-
Safety Advisors Comments
-
Photo Records:
-
Safety Advisor
-
Site Representative
-
I confirm that all actions highlighted within this report have been completed