Information
-
Site & Audit Title
-
Conducted on
-
Prepared by
-
Personnel
Site overview
-
Principal Contractor
-
Sewer Contractor
Site Safety & Management
-
Contractor has approved up to date construction plans on site
-
Nominated supervisor on site
-
Correct PPE being worn as per site specific requirements
-
Contractor has Project Management Plan onsite and up to date
-
Contractor has Safe Work Method Statments (SWMS) on site and up to date
-
Contractor has Inspection Test Plan on site and up to date
-
Contractor has Site Induction documentation on site and up to date
-
Contractor has One call documentation on site and up to date
-
Is traffic control required?
Tap to enter information
-
Is traffic management adequately set up and maintained
Confined Spaces
-
Is confined space entry required
Tap to enter information
-
Has permit to work been obtained
-
Is gas detector in use
-
Correct PPE used and in date?
Machinery
-
Is machinery in use
Tap to enter information
-
Does plant have flashing lights that are working and being used
-
Does plant have reversing beepers
-
Has provision for overhead and under ground services been allowed for
Excavations / Trenching
-
Are there any excavation works
Tap to enter information
-
Is trenching / excavation > 1.5m deep with appropriate protection
-
Edge protection & ladder access in place
-
Is there a "Mine Mangers" certificate holder on site
-
Is spoil away from edge of trench
-
Appropriate dewatering in place if necessary
Pipe laying
-
Pipe laying construction inspected?
Tap to enter information
-
Is alignment as shown on detailed plan
-
Correct pipe class/in date
-
Bedding Material is approved and installed as required within code
-
Are pipe layers ensuring pipe is pushed fully home to witness marks
-
Are joints free from contamination i.e. dust, dirt, mud and free from water
Property Branches
-
Property branches inspected
-
Are property branches being constructed in accordance with the standard drawings
-
Does the excavation extend a minimum of 300mm beyond the end of the property branch fitting.
Backfilling
-
Backfilling inspected?
-
Backfill complies with specification and design
-
Has compaction testing been carried out by a NATA registered tester
Maintenance Structures
-
MH internals inspected?
Tap to enter information
-
Location as per design
-
Base layout as per design
-
MH connector/coupling placed as per standard drawing
-
Nibwall formwork being utilized
-
Formwork in satisfactory condition
-
Step irons/ladders located and installed correctly
-
Has concrete been vibrated
-
Is MH finish within wall and channel acceptable
-
Have drops been installed in accordance with standard drawings
-
IS/MS frame and surround sturdy
-
IS/MS 225-300mm stack clearance to top of cover
-
Concrete infill behind drop structure
-
Height of make up ring 300/350mm maximum
Trench/Surface Restoration
-
Was trench restoration inspected?
Tap to enter information
-
Have private properties given acceptance
-
Sewer has adequate protection from heavy machinery
-
All disturbed surfaces have been reinstated
Summary
-
Comments
-
Photo Records:
-
Superintendent Representative