Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Water Authority Validation Officer present?

  • Tap to enter information
  • Personnel

Site overview

  • Inspection carried out the following time

  • Select date

  • Principal Contractor

  • Watermain Contractor

  • Number of workers on site

  • Weather

  • Site conditions

  • Additional site conditions:

  • Further Works Required?

  • All actions from previous inspection report completed

Testing

  • Testing Undertaken

  • Tap to enter information

Watermain swabbing

  • Backflow prevention device installed?

  • Swabbing

  • Swab
  • Line Swabbed

  • Potable Result

  • Photo of Swab

  • Recycled Result

  • Photo of Swab

  • Tap to enter information

Watermains Pressure Test

  • Has pre-testing been completed & witnessed?

  • Tap to enter information
  • Witness

  • Date of Witness

  • Tap to enter information
  • Why was it not witnessed?

  • Has a copy of the pre-test paperwork been received?

  • Swabbing of the lines has been successfully completed

  • Lines flushed till running clear

  • No visual failures are evident

  • Gauges

  • Gauge
  • Serial Number

  • Calibration date

  • Is there 5% PE on the job?

  • Tap to enter information

Potable

  • Pressure adopted

  • Time started

  • Time finished

  • Potable pressure does not continue to drop throughout test period of 15 minutes

  • Tap to enter information
  • Was the main pumped up again?

  • Tap to enter information
  • Pressure adopted

  • Time Started

  • Time Finished

  • Potable pressure does not continue to drop throughout test period of 15 minutes

Recycled

  • Pressure adopted

  • Time Started

  • Time Finished

  • Recycled pressure does not continue to drop throughout test period of 15 minutes

  • Tap to enter information
  • Was the main pumped up again?

  • Tap to enter information
  • Pressure adopted

  • Time Started

  • Time Finished

  • does not continue to drop throughout test period of 15 minutes

  • Tap to enter information

Potable

  • Has stage been left at mains pressure overnight?

  • Time Started

  • Pressure adopted

  • Litres required after hour 1

  • Litres required after hour 2

  • Litres required after hour 3

  • Litres required after hour 4

  • Litres required after hour 5

  • Pass if; ∆V (hour 5) ≤ 0.55 x ∆V (hour 3) + Vall

  • Vall = 0.14 x L x D x H

  • L = Test Length in Km

  • D = Pipe diameter in metres

  • H = Average test head in metres

  • Test Result

Recycled

  • Has stage been left at mains pressure overnight?

  • Time Started

  • Pressure adopted

  • Litres required after hour 1

  • Litres required after hour 2

  • Litres required after hour 3

  • Litres required after hour 4

  • Litres required after hour 5

  • Pass if; ∆V (hour 5) ≤ 0.55 x ∆V (hour 3) + Vall

  • Vall = 0.14 x L x D x H

  • L = Test Length in Km

  • D = Pipe diameter in metres

  • H = Average test head in metres

  • Test Result

Summary

  • BW Auditors Comments

  • Photo Records:

  • BW Auditor

  • Site Representative

  • I confirm that all actions highlighted within this report have been completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.