Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Concretor
-
Is WC power on site
-
House sited correctly
-
Termite treatment as per spec
-
Thickenings as shown
-
Step down to correct height
-
Shower position & size is correct
-
Slurry off top of footings / rebate
-
Road left clean
-
Pipes left sitting plumb
-
Stripped boxing inc. showers
-
Is there left over material? Notify office.
-
Post pads correct
-
Checked orders / plans for non - standard items
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit