Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site overview
-
Principal Contractor
-
All actions from previous inspection report completed
1. Site Documentation
-
1.1 Site documentation pack
-
1.2 RAMS Pack
-
1.3 All CJL ltd company operatives inducted by Principal Contractor
2. Emergency Arrangements
-
2.1 All accidents, incidents and near misses reported and investigated since last visit.
-
2.2 First aid arrangements in place
-
2.3 Fire arrangements in place
-
2.4 Environmental arrangements in place (spill kit)
3. Occupational Health
-
3.1 Occupational Health - Manual Handling
-
3.2 Occupational Health - Hand Arm Vibration
-
3.3 Occupational Health - Respiratory Protection
-
3.4 Occupational Health - Skin Protection
-
3.5 Occupational Health - Eye Protection
-
3.6 Occupational Health - Noise protection
4. Work at Height
-
4.1 Adequate controls in place for work at height
5. Excavations < 1.2m
-
5.1 Documentation/registers/permits in place if required
-
5.2 Edge protection in place
-
5.3 Services adequately protected
6. Excavations >1.2m
-
6.1 Documentation & registers including permits
-
6.2 Edge protection & ladder access in place
-
6.3 Services adequately protected
7. Confined Spaces
-
7.1 Documentation & registers including permits
-
7.2 Emergency arrangements in place
-
7.3 Operatives working to agreed Method Statement
8. Plant & Equipment including Documentation
-
8.1. 360 Excavators
-
8.2 Ride on Dumpers
-
8.3 Ride on Rollers
-
8.4 Power Tools (disc cutters/compactor plates etc)
-
8.5 Hired Plant
-
8.6 Other Plant and Equipment
9. Lifting operations
-
9.1 Lifting operations & controls
-
9.2 Lifting operations (lift plan & competency of operatives)
10. Material storage & controls
-
10.1 Fuel storage and controls
-
10.2 COSHH storage and controls
-
10.3 Material storage arrangements and controls
-
10.4 LPG storage arrangements and controls
-
10.5 Housekeeping of storage areas & Containers
11. Principal Contractor Elements
-
11.1 Canteen clean & adequate for numbers on site
-
11.2 Toilet facilities clean & adequate for numbers on site
-
11.3 Principal Contractors emergency arrangements
12. Other Activities.
-
12.1. Other
-
12.2. Other
-
12.3. Other
Summary
-
Safety Advisors Comments
-
Safety Advisor
-
I agree that a copy of this report has been given to me and that corrective actions has been taken or will be taken to rectify those items
-
Site Representative
-
I confirm that all actions highlighted within this report have been completed
-
Contracts manager name signature and date