Title Page

  • Document No.

  • C14 Weekly Safety & Environmental Checklist

  • Site

  • Location
  • Conducted on

  • Auditor

  • Personnel

  • Do you want a complete full C14 Audit?

1.0 House Keeping

  • 1.1 Bins accessible, not overflowing?

  • 1.2 Compound has clear walkways?

  • 1.3 Site skip bin accessible, not overflowing?

  • 1.4 Site Sheds & Crib Sheds clean and tidy?

2.0 Emergency Equipment Available

  • 2.1 Stretcher / Sked?

  • 2.2 Spill Kit?

  • 2.3 Rescue Buoy?

  • 2.4 Harness?

  • 2.5 Tripod & Winch ?

  • 2.6 Gas Detector?

  • 2.7 Mega Phone / Air Horn?

  • 2.8 Emergency Controller, Deputy Controller & First Aid clothing available?

  • 2.9 Fire Extinguishers in date? (6 months)

  • 2.10 First Aid stocked and in date ( 3 months)

3.0 Temporary Traffic Management & Security

  • 3.1 Principle Contractor Signage at all entry points?

  • 3.2 Traffic Control Signs in place?

  • 3.3 Clear access around site?

  • 3.4 Temporary Traffic Management checklist completed?

  • 3.5 Site perimeter fencing is secure & intact?

4.0 Services ( overhead / underground)

  • 4.1 Are overhead services present onsite and identified ?

  • 4.2 Are underground present onsite and identified?

4.0 Mobile Plant

  • 4.1 Daily Pre-start checklist completed?

  • 4.2 Operator has Verification of Competency for operating Mobile Plant?

  • 4.3 All Vehicles / Mobile Plant on site have working beacon lights?

  • 4.4 Reversing beepers / alarms operational on Mobile Plant?

  • 4.5 Lifting equipment operational, tested & in date?

  • 4.6 Mobile Plant / Vehicles operated in safe manner?

5.0 Excavations / Trenches

  • 5.1 Excavation / Trench inspections completed & up to date?

  • 5.2 Excavations / Trenches adequately barricaded / protected when works inactive / end of shift?

  • 5.3 Excavations / Trenches greater then 1.5m benched / battered ?

  • 5.4 Access / egress from trenches / excavations safe?

6.0 Hazardous Substances

  • 6.1 Are Safety Data Sheets provided for all chemicals onsite, and current (within 5 years) ?

  • 6.2 Are Dangerous Goods stored as per SDS?

  • 6.3 Are Hazardous Substances stored as per SDS?

  • 6.4 Is the Hazardous Substance Container clean & tidy?

7.0 Sub Contractors Management

  • 7.1 Are Sub-Contractor SWMS up to date?

  • 7.2 Are Sub-Contractor SWMS complied with & personnel are inducted into SWMS?

  • 7.3 Are all personnel wearing appropriate PPE as designated by the relevant SWMS?

8.0 Huon SWMS

  • 8.1 Are Huon SWMS current?

  • 8.2 Are Huon SWMS complied with & relevant personnel inducted into SWMS?

  • 8.3 Are all personnel wearing appropriate PPE as designated by the relevant SWMS?

9.0 Administration

  • 9.1 Toolbox Talk records up to date?

  • 9.2 Emergency Plan Current & on display

  • 9.3 First Aiders list current & on display

  • 9.4 Emergency Assembly area clear and accessible?

  • 9.5 All personnel onsite inducted?

  • 9.6 All personnel onsite signed into Signonsite?

  • 9.7 WHS information recorded on Foreman's Diary?

10.0 Environmental

  • 10.1 Environmental and Sediment Control Plan Up to date?

  • 10.2 Silt fences in place - adequate? As per plan?

  • 10.3 Sumps have silt socks in place?

  • 10.4 Hay bales in place?

  • 10.5 V-drains / swales maintained?

  • 10.6 Stockpiles placed at approved locations and adequate silt fences installed?

  • 10.7 Does the site have clean, stabilised access?

  • 10.8 Dust Suppression in use on site - water cart?

  • 10.9 Re-vegetated/ Stabilised areas intact?

  • 10.10 Undisturbed areas checked and intact?

  • 10.11 Fencing of protected trees adequate?

  • 10.12 Site free from spill and pollution?

  • 10.13 Any other environmental issues?

  • 10.14 Sediment Ponds

  • Sediment Pond
  • Note down pH & NTU

  • Suitable for discharge?

  • Discharge Time

  • Flocculation details & Volume of sediment removed

11.0 Comments

  • 11.1 Further comments / observations?

12.0 Corrective actions / follow up

  • 12.1 Action?

  • 12.2 Who by?

  • 12.3 Due date?

Inspection Completed by

  • Systems

  • Project Manager

  • Engineer

  • Foreman / Leading Hand

  • Sub-Contractor

  • Site Personnel

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.