Title Page

  • Location
  • Conducted on

  • Prepared by

  • INSTRUCTIONS
    ----------------------

    1. Start by choosing an inspection report. You may choose both reports if needed.
    2. Answer the necessary text or question fileds.
    3. Add photos and notes by clicking on the paperclip icon.
    4. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
    5. Complete audit by providing digital signature.
    6. Share your report by exporting as PDF, Word, Excel or Web Link.

  • Choose Inspection Report

QUARRY INSPECTION REPORT

  • Quarry

  • Pipeline

  • Items to be inspected

Check Stand-Off and Slope Profile (Against Easement)

  • Stand-Off (pipeline to crest of slope)

  • Is Stand-Off/Easement fencing in place?

  • Is Stand-Off consistent along slope?

  • Are crossing points clearly marked?

  • Provide or snap a photo (paperclip icon above)

  • Overburden slope angle:

  • ❑ Horizontal

  • ❑ Vertical

  • Are sight boards in place and at correct angle?

  • Any benches?

  • Provide no. of benches

  • Mineral slope angle:

  • ❑ Horizontal

  • ❑ Vertical

Extent of Excavation/Phase being worked?

  • Take a photo

  • Write details or captions here

Inflow of Water from Mineral Deposit?

  • Take a photo

  • Write details or captions here

Tensile Cracks or Fissures

  • Are there any evidence of tensile cracks and fissures along crest of slope?

Slips

  • Any slips on slope?

Blasting

  • Indicate Blast Results

  • Blasting
  • Event

  • Date and Time

  • MIC

  • PPV

  • Distance (blast to recorder)

Plant Movement

  • Dumper Trucks

  • Excavators

  • Conveyors

  • Provide sketch of the conveyor location

  • Other

  • Click the button on the right to add details.

  • Equipment
  • Specify equipment used

Pipeline Protection Condition (e.g. Slabs, Crossing Points, etc)

  • List the conditions here

Weather Conditions

  • List the conditions here

Other Comments and Information

  • Need more details?

  • Click the button on the right

  • Additional Info
  • Write comments here

  • Upload photo

QUARRY ENCROACHMENT PARAMETERS

  • Items

Pipeline

  • Section

  • Feeder No.

  • Year Constructed

  • Location
  • OS Ref

  • From MP (Metres)

  • To MP (Metres)

Quarry

  • Quarry Operator

  • Quarry

Agreed Slope for Pipeline Protection During Extraction

  • Extraction Phase

  • Minimum Stand-Off (Pipeline to centre-line of Slope Crest)

  • Overburden Slope Angle (to Horizontal)

  • No.of Benches

  • Bench width

  • Mineral Slope Angle (to Horizontal)

Sketch of Excavation Face Profile

  • Draw sketch here

COMPLETION

  • Inspection carried out by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.