Clarity about the job (Sections A&B)
-
Are the rolls and responsibilities and points of contact on site clear?
-
Is the contractor aware of of and taking account of the key hazards and pre-construction information?
-
Is the contractor clear on their scope of work and working to plan?
-
Are permitry requirements (inc SCO) up to date and being adhered to?
-
Are site rules understood and adhered to by contractor?
-
Is it clear which risks are being managed by NGGDL (e.g SCO) and which the contractor is managing.
-
Has the contractor got adequate supervision and monitoring in place ?
-
Does the use of any sub-contractors by the contractor appear to be well managed?
Site area & Handover (Sections C-E)
-
Are all site plans accurate and available, including Gas & Electric drawings?
-
Are all vehicles parked correctly and not causing an obstruction?
-
Has the appropriate signing lighting and guarding been utilised on site?
Emergency plan (Section F-G)
-
Are response procedures in place for all identifying emergency situations?
-
Is there a process in place for reporting injuries?
-
Is there a first aid kit available and in date?
RAMS check & controls (Section H-K)
-
Has the contractor an up to date site specific risk assessment that adequately IDENTIFIES safety and environmental hazards ?
-
Does the risk assessment specify adequate CONTROLS and are these controls in place?
-
Are the correct Personnel onsite with evidence of qualifications available if required ?
-
Can the contractor confirm that the correct equipment is being used on site and any tests or inspections are in date?
-
Can the contractor confirm that the correct plant is being used on site and any maintenance records are in date?
-
Can the contractor confirm that the appropriate PPE is being used?
-
If temporary works are required, has the temporary works design been checked by a competent person, registered on a temporary works register and been approved by a competent temporary works coordinator?
-
Are the contractors aware of and working to appropriate Policies, Procedures &a Standards specific to the work being undertaken? Is section M signed?
Site Control Duties (Section L)
-
Is it clear who is in control of the works area(s)?
-
Is there evidence of of Control of safe access, egress and site demarcation ?
-
Is there evidence that people coming on site are being inducted?
-
Has the register been updated ? (At start of and during the work)
-
Are welfare facilities appropriate for the work being undertaken?
Scope or Changes on site (Section N)
-
Have any changes of Scope by National Grid Gas Distribution been auctioned appropriately?
-
Does the contractor know when and how to contact NGGD if things change ?
-
Have any changes on site been reflected in the RAMS, pre authorised in the permitry and been appropriately briefed?