Title Page

  • Document No.

  • Project Name

  • Site name

  • Conducted on

  • Prepared by

  • Location
  • Contractor (Company)

Clarity about the job (Sections A&B)

  • Are the rolls and responsibilities and points of contact on site clear?

  • Is the contractor aware of of and taking account of the key hazards and pre-construction information?

  • Is the contractor clear on their scope of work and working to plan?

  • Are permitry requirements (inc SCO) up to date and being adhered to?

  • Are site rules understood and adhered to by contractor?

  • Is it clear which risks are being managed by NGGDL (e.g SCO) and which the contractor is managing.

  • Has the contractor got adequate supervision and monitoring in place ?

  • Does the use of any sub-contractors by the contractor appear to be well managed?

Site area & Handover (Sections C-E)

  • Are all site plans accurate and available, including Gas & Electric drawings?

  • Are all vehicles parked correctly and not causing an obstruction?

  • Has the appropriate signing lighting and guarding been utilised on site?

Emergency plan (Section F-G)

  • Are response procedures in place for all identifying emergency situations?

  • Is there a process in place for reporting injuries?

  • Is there a first aid kit available and in date?

RAMS check & controls (Section H-K)

  • Has the contractor an up to date site specific risk assessment that adequately IDENTIFIES safety and environmental hazards ?

  • Does the risk assessment specify adequate CONTROLS and are these controls in place?

  • Are the correct Personnel onsite with evidence of qualifications available if required ?

  • Can the contractor confirm that the correct equipment is being used on site and any tests or inspections are in date?

  • Can the contractor confirm that the correct plant is being used on site and any maintenance records are in date?

  • Can the contractor confirm that the appropriate PPE is being used?

  • If temporary works are required, has the temporary works design been checked by a competent person, registered on a temporary works register and been approved by a competent temporary works coordinator?

  • Are the contractors aware of and working to appropriate Policies, Procedures &a Standards specific to the work being undertaken? Is section M signed?

Site Control Duties (Section L)

  • Is it clear who is in control of the works area(s)?

  • Is there evidence of of Control of safe access, egress and site demarcation ?

  • Is there evidence that people coming on site are being inducted?

  • Has the register been updated ? (At start of and during the work)

  • Are welfare facilities appropriate for the work being undertaken?

Scope or Changes on site (Section N)

  • Have any changes of Scope by National Grid Gas Distribution been auctioned appropriately?

  • Does the contractor know when and how to contact NGGD if things change ?

  • Have any changes on site been reflected in the RAMS, pre authorised in the permitry and been appropriately briefed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.