Title Page
-
Document No.01160317
-
SCCF Step 9: Operate Site Control Checklist Version2
-
Work Order / Job Voucher Number
-
Conducted on
-
Prepared by Steve Yarrow
-
Site Address
-
Contractor
SCCF Step 9: Operate Site Control Checklist Version 2
Clarity about the job (Sections A-B)
-
Are roles and responsibilities and points of contact on site clear?
-
Is the contractor aware of and taking account of the key hazards and pre-construction information?
-
Is the contractor clear on their scope of work and working to a plan?
-
Are permitry requirements (incl. SCO) up to date and being adhered to?
-
Are site rules understood and adhered to by the contractor?
-
Is it clear which risks are being managed by Cadent Gas (e.g. SCO) and which the contractor is managing?
-
Has the contractor got adequate supervision and monitoring in place?
-
Does the use of any sub-contractors by the contractor appear to be well managed?
Site area and Handover (Sections C-E)
-
Are all site plans accurate and available, including Gas and Electric drawings?
-
Are the vehicles parked correctly and not causing an obstruction?
-
Has appropriate Signing, Lighting and Guarding been utilised on site?
-
Is it clear who is in control of the work area(s)?
-
Is there evidence of control of safe access, egress and site demarcation?
-
Is there evidence that people coming onto site are being inducted?
-
Has the site register been updated? (At start of and during work)
-
Are welfare facilities appropriate for the work being undertaken?
Emergency Plan (Sections F-G)
-
Are response procedures in place for all identified emergency situations?
-
Is there a process in place for reporting injuries?
-
Is a first aid kit available and in date?
RAMS check and Controls (Sections H-L)
-
Has the contractor an up to date site specific risk assessment that adequately IDENTIFIES safety and environmental hazards?
-
Does the risk assessment specify adequate CONTROLS and are these controls in place?
-
Are the correct personnel on site and with evidence of qualifications available if required?
-
Can the contractor confirm that the correct equipment is being used on site and any tests or inspections are in date?
-
Can the contractor confirm that appropriate PPE is being used?
-
If temporary works are required has the temporary works design been checked by a competent person, registered on a temporary works register and been approved by a temporary works co-ordinator?
-
Are the contractors aware of and working to appropriate Policies, Procedures, and Standards specific to the work being undertaken? Is section M signed?
Scope or Changes on site (Section M)
-
Have any changes of scope by Cadent Gas been actioned appropriately?
-
Does the contractor know when and how to contact Cadent Gas if things change?
-
Have any changes on site been reflected in the RAMS, pre-authorised in the permitry and been appropriately briefed?
-
Cadent Gas Supervisor
-
Contractor
-
I can confirm that all necessary checks have been undertaken on the site and that all relevant paperwork is correct at the time of this check being undertaken.