Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Persons in charge of works
Documentation
-
Is the Safety Statement in date and signed by operatives on site and Director of company.
-
Is there a Risk Assessment & Method Statement (RAMS) in place and signed by all operatives?
-
Has a Safe Start been completed and signed by all operatives?
-
Have all operatives been inducted?
-
Is there training records available for inspection?
-
Are relevant permits being applied for and issued e.g. excavation permits, hot works permits, working at heights permits?
-
Are regular toolbox talks being delivered as per agreed schedule? State topics covered during the previous month.
-
Are the CPD hours for employees for toolbox talks being updated to the schedule / software, with completed TBT sign-off forms scanned & uploaded to the system?
Housekeeping
-
Is the work area clean and tidy? Are walkways are clear of obstructions?
-
Adequate amount and inspected fire extinguishers available?
-
Skips & bins are available and emptied as needed?
-
Materials are are stacked and stored in an orderly manner?
-
Hazardous conditions – are dust, mud on roads, noise and vibration being managed adequately?
Electrical
-
Is lighting adequate?
-
Are there any power tools in use?
-
Power leads & plug tops in good condition?
-
All leads are fully uncoiled?
-
Battery tools in use and operated safely?
-
Have the electrical items been PAT Tested?
-
No defects observed with power tools in operation?
Work at Height
-
Is working at height equipment being used properly and in a safe manner?
-
Please select the equipment in use?
- Straight Ladders
- A-Frame Ladders
- Podium Ladders
- Alloy Towers
- Scaffolding
- Stilts
- Hop-Ups
- Pop-Ups
- None in use
- MEWP
-
Was there a harness / lanyard / inertia reel in use and used in the correct manner and secured to a designated anchor point?
-
Are GA3 inspections up to date for all work at height equipment?
Plant & Lifting Equipment
-
GA1's for certified plant and lifting equipment including chains, slings, hooks etc. available on site and in date?
-
Please list the items of plant in use by the subcontractor on site?
-
GA2 Statutory Inspections up to date for all plant and lifting equipment?
-
Operated by trained personnel? CSCS Training tickets recorded on site?
-
Plant / lifting equipment up to standard / undamaged?
-
Is the SWL clearly displayed on the Plant?
-
No loads being lifted over persons at work, passing members of the public or site operatives?
-
Exclusion zones in operation and certified Banksman available for coordinating lifts and vehicle movement?
-
Are spill kits and fire extinguishers available in each excavator?
Excavations
-
Are AF3 forms for excavations completed and up to date? Check excavations are stepped if required or adequate means of trench support in place.
-
Is safe access and egress provided to excavations?
-
Is adequate dewatering being carried out on site to excavations safe and dry?
PPE
-
Please select the PPE required on site
- Safety Hat
- Hi Vis Vest
- Safety Boots
- Safety Gloves
- Safety Glasses
- Ear Defenders
-
Is additional appropriate PPE being used for certain tasks? ie: face mask, ear protection, tasks specific gloves etc?
-
Was PPE compliance being followed on site? If not, please give details.
-
Is the PPE issue log being maintained?
General Site Safety
-
Are manual handling activities being planned and co-ordinated to avoid manual handling where possible by using mechanical lifting aids or equipment?
-
Hazardous substances – are chemicals on site stored safely, in correct type of containers and MSDS sheets available?
-
Do employees have access to adequate welfare facilities including toilets with warm water for washing hands and suitable canteen facilities?
-
Is there a suitable and well-stocked first aid kit available on site?
-
Are accidents and incidents being recorded on the relevant forms?
Overall
-
Is there any suggestions that could be made to improve safety on the site.
-
Please detail the work on going on site
-
Please detail any positive behaviors or good compliance observed on site
-
Provide evidence that issues raised in the previous audit have been addressed and closed out