Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Inspection Items
-
All flashings, DPC's, and weep holes installed in accordance with Clarendon standards.
-
Stepped cavity flashings formed and cleaned in accordance with Clarendon specifications.
-
Brick ties positioned in accordance with BCA.
-
Sufficient Clearance has been provided between windows and brick sills in accordance with BCA.
-
Cavities and flashings left clean.
-
Is alcor tray installed over steel beam, is tray turned up and cleaned?
-
Is brickwork overhanging slab?
-
Perp and bed joints consistent within standards and BCA?
-
Stair void fall protection left in tact with access hatch closed.
-
House area left cleaned of all trade waste and placed in waste enclosure.
-
Ensure granitguard system installed in accordance with Australian Standards.
-
Has job been brick cleaned?
-
Add signature