Information

  • Property No.

  • Owner/Applicant

  • Conducted on

  • Inspected by

  • Location

AWTS Commissioning

  • System installed as per approved specifications and plan

  • Tank/s have been back filled to a minimum 100mm above ground level with sludge return pipe covered (if installed) NOTE: the join of the tank lid and wall shall be a minimum of 100mm above ground level

  • System operating satisfactorily at time of inspection

  • Air blower and specified pumps installed and operating

  • Tank lid has been sealed with fine cement or seals tic sealant

  • Irrigation area is as per approved plan with sufficient turfed area available for disposal

  • All electrical wiring is protected by conduit that is fixed to the tank and supported where necessary

  • Written certification provided from the manufacturer or the agent for installation of facility

  • Comments

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.