1.0 Previous Inspection
-
1.1 Has the last inspection been reviewed?
-
1.2 Have all deficient action items from previous inspection been addressed and closed out?
2.0Trailers
-
2.1 Door ways free and clear of obstructions
-
2.2 Fire extinguishers mounted at each access/egress
-
2.3 Fire extinguishers inspected monthly and in good working condition
-
2.4 Fire extinguishers mounted with appropriate signage above
-
2.5 Housekeeping
-
2.6 Lunch room clean and tidy
-
2.7 Safety bulletin board with ERP posted
-
2.8 Safety bulletin board with JOSH COMMITTEE Minutes posted
-
2.9 Harassment Policy posted
-
2.10 Sites Absolutes posted
-
2.11 Required PPE available to workers
-
2.12 Dirty PPE hung in lunch trailer
-
2.13 All required garbage/recycle receptacles provided and emptied regularly
-
2.14 JHA cards, Orange cards and near miss cards available and in a conspicuous location
-
2.15 MSDS, JHA's, Health & Safety Manual, Saskatchewan Health & Safety Act & Regulations readily available
-
2.16 Drinking water provided
-
2.17 Washrooms available with wash stations
-
2.18 Cleaning products and other products containing hazardous ingredients properly labeled with MSDS available
3.0 Seacan
-
3.1 Housekeeping
-
3.2 Are there any flammable items not stored in flam cabinet?
-
3.3 Is there a fire extinguisher?
-
3.4 Is there signage telling the workers that there is a fire extinguisher in sea can posted in a conspicuous location?
-
3.5 Fire extinguisher mounted, inspected and signage above?
-
3.6 Slings hung up and not on floor or shelves
-
3.7 Garbage receptacle in sea can or near bye
-
3.8 Aisle/walkway free and clear of obstructions.
-
3.9 Tools properly stored
-
3.10 Adequate lighting
Lay down Areas
-
3.11 All products stored on pallets or at least off the ground
-
3.12 General Housekeeping
-
3.13 Waste receptacles available or at least nearby.
-
3.14 Propane tanks and other pressurized tanks at least 3 metres from all access/egress
-
3.15 Flam Cabinet
-
3.16 Spill containment units clean and free of contaminants
-
3.17 Where required, material stored in non assigned lay down areas for longer than 24 hours are appropriately delineated.
-
3.18 Containers with hazardous ingredients properly labeled with MSDS available
4.0 Vehicle & Equipment
-
4.1 Inspection books with vehicle and inspected as required
-
4.2 Vehicle lock out procedures used when not in use
-
4.3 Fire extinguishers supplied, inspected and in good working order
-
4.4 Vehicle clean and free of loose materials and obstructions
5.0 Access/Egress
-
5.1 Access/Egress free and clear of any obstructions
-
5.2 If access/egress if scaffolding, has scaffold been inspected and dated with appropriate tags?
-
5.3 Swing gates in good working condition
-
5.4 Signage at access points
-
5.5 Leading edge demarcated at least 2 metres from edge
6.0 At The Work Location
-
6.1 Proper signage posted warning of hazards in area, ie the requirement for hearing protection etc.. At access point.
-
6.2 Leading edges barricaded with hard barricades and or control zones demarcated 6.5 ft back from leading edge
-
6.3 FLRA at the work face
-
6.4 FLRA describing tasks being conducted with all hazards described and controls to be in place
-
6.5 FLRA led by Supervisor with the full participation of all affected crew members and signed to acknowledge understanding.
-
6.6 FLRA reviewed and revised as scope changes and and every break.
-
6.7 ERP posted and at the work face
-
6.8 All pertinent JHA's posted at the work face, reviewed by all crew members and signed off
-
6.9 Harness and equipment inspections at the work face and inspected, filled out and signed by all affected crew members
-
6.10 Tools inspected prior to start up
-
6.11 Housekeeping
-
6.12 Specialized PPE inspected and worn when work scope requires it
Hoisting Material on Roof
-
Material placed along purlins to ensure weight distribution
-
Rigging inspected prior to use
-
Tag lines on all loads