Information
-
Document No.
-
Capital Works Assessment
-
Conducted on
-
Location
-
Personnel
-
Conducted by
Project Details
-
Road Number
-
Road Name
-
Project Start (km)
-
Project Finish (km)
-
From Origin (town or place)
-
Length (km)
-
Width (m)
- 3.0
- 3.25
- 3.5
- 3.75
- 4.0
- 4.50
- 5.0
- 5.50
- 6.00
- 6.5
- 7.0
- 7.5
- 8.0
-
Depth (mm)
- 50
- 75
- 100
- 125
- 150
- 175
- 200
- 250
- 300
-
Nature of Project
-
Total Estimated Cost ($$)
-
Total Estimated Construction Time (days)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Funding Source
Assessment Criteria
Road Network Efficiency
-
Does this section of road support a bus route?
-
Hierarchy
- 1
- 2
- 3
- 4
- 5
- 6
Actual Road Usage
-
AADT
-
Heavy Vehicle Estimate<br>
Road Condition
-
Roughness
-
Edge Failures
-
Edge Performance
Geometric, Safety & Seal Deficiencies
-
Seal
-
Formation
-
Does the work rectify Geometry?
-
Vertical Alignment- Sight Distance Adequate
-
Horizontal Alignment- Sight Distance Adequate
Inspection Finalization
-
Add signature