Information
-
Client / Site
-
Conducted on
-
Location
-
Personnel Involved In Completing JHA (please list)
Task Requirements
TASK REQUIREMENTS
-
JHA NUMBER
-
Task Description
EQUIPMENT Description of Equipment (Tools, Vehicles and Machinery) to be used for the duration of this JHA.
-
Required Equipment
Equipment
-
Tools/Plant/Machinery
- Compactor/Roller
- Dozer
- Dump Truck
- EWP/Scissor Lift
- Excavators
- Generator
- Grader
- Hand Tools
- I.T.
- Light Truck
- Lighting Plant
- Loader
- Moxy
- Scraper
- Water Cart
- Other
-
Please specify
-
Qualification/Certificate to operate the Equipment (if required)
-
Please specify
-
Details of Special Precautions to be taken (including environmental/heritage considerations)
-
Pre-Task Training/Instruction Required (permit training, clearing training, etc.)
Type of Permit/Special Procedures Required for this JHA (Please indicate by selecting at least one option from the lists below) NOTE: Associated paperwork or permits are to be attached
-
Civil/Earthworks (select all that apply)
- Aboriginal Heritage Sites
- Boundary Clearing
- Clearing Permit
- Critical Crane Lifts
- Excavation/Dig Permit
- Explosives/Blasting
- Flora/Fauna
- How Work Permit
- Mobile Plant
- MSDS
- Spill Kit
- Spotters
- Traffic Management Plan
- Other
-
Please Specify
-
Construction Works (select all that apply)
- Confined Space Permit
- Critical Crane Lifts
- Electrical Isolation
- Gas Testing
- Grid Mesh/Floor Removal Permit
- Hot Work Permit
- Mechanical Isolation
- Mobile Plant
- MSDS
- Scaffolding
- Sand Blasting
- Spotters
- Traffic Management Plan
- Work Box/Man Cage Permit
- Work with Heights Permit
- Working Over Voids
- Other
-
Please Specify
PPE/Other Requirements (Please indicate by selecting at least one option from the lists below)
-
Select All That Apply
- Barricading
- Face Shield
- Fall Arrest
- Extinguisher
- Fall Protection
- Fire Blankets
- Gloves
- Hearing Protection
- Hi Visibility Vst
- Mono-googles
- P2 Dust Mask
- P2 Dust Overalls
- PVC Pants/Boots/Coat
- Radio/Phone
- Respirator Type
- Safety Footwear
- Safety Glasses
- Safety Helmet
- Signage
- Other
-
Please specify
Once this section is complete, move onto the 'Job Steps' section.
Job Steps
JOB STEPS AND RISK ANALYSIS Refer to the Risk Matrix below to evaluate the 'Risk' and 'Residual Risk' for each hazard and control.
-
Basic Job Steps
Step
-
Job Step
-
Hazard and Control
Hazard
-
Existing/Potential Hazard
-
Recommended Corrective Measure
-
Residual Risk
-
Reviewed by - Contractor Supervisor
-
Approved by - Senior Manager
Once signed off by both parties, move onto the next section for employees to sign onto the JHA.
Sign On
SIGN ON SHEET
-
Persons Working Under the Direction of this JHA
Employee
-
In signing this form, I understand the work procedures/methods as described in the JHA, and have been given the opportunity to ask questions.
-
Full Name and Signature (date will update automatically once signed)