Information
-
CPA works number
-
Site address
-
Conducted on
-
Supervisor
-
Location
-
Gang & Charge-hand Name
-
Site Photo
Safety Observations
-
Housekeeping
-
Service avoidance (under and overhead) use of CAT
-
PPE
-
Ladders/cherry picker
-
Cutting & Grinding
-
Noise/dust
-
Manual Handling (reduced where possible)
-
Fire protection and First Aid
-
COSHH being used correctly? Labelled containers etc
-
Lifting equipment in test
-
HAV's
Traffic management
-
Has the diversion route been posted?
-
Have ramps been installed at cuts and iron work?
-
Correct signage posted? Ie Iron works raised, loose chippings?
Quality
-
Are materials correct to job
-
Are Plant & vehicle correct to the job?
-
Are works following design?(CVI)
-
Expected Progress
Patching
-
Patching
-
Are patches planed to correct depth?
-
Has bond coat been applied? Including vertical edges
-
Has the material temp been checked before laying?
-
Has the material temp been checked before laying?
-
Are patches compacted satisfactorily?
Resurfacing
-
Resurfacing
-
Are weather conditions correct for laying blacktop?
-
Is carriageway planed to correct depth?
-
Has ironwork been adjusted to correct level?
-
Has bond coat been applied? Including vertical edges
-
Has the material temp been checked before laying?
-
Has the material been adequately rolled?
Surface dressing
-
Surface Dressing
-
Has the site been correctly patched?
-
Is the ploughing and cleaning complete?
-
Is the iron work masked and the site swept?
-
Is the air temperature correct and road surface free from moisture?
-
Is the binder spread rate correct?
-
Are the correct chipping being applied?
-
Are the Chipping's being rolled correctly with rubber coated rollers?
Roadmarkings
-
Is line of the required quality?
Acknowledgement
-
Chargehand signature
-
Supervisor Signature