Title Page

  • Site conducted
  • Conducted on

  • Prepared by

  • Location
  • S Reference

  • Name of person being checked

CFO Quality Audit: Express Aerial PIA

Pole

  • Has a pole pre climb / pre work label been completed and attached to pole

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • Pole test label attached and visible on pole

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • If unclimbable has a hoist been used / noted.

Aerial Cable

  • Is the aerial cable installed across the carriageway? (Include Photo)

  • Is the aerial cable installed above height of 5.5m if over carriageway (Include Photo)

  • Confirm action raised to Senior Operations Manager, Kellys Regional Operations Manager and CFSafety@kelly.co.uk

  • What is the height of the aerial cable at the lowest point and at curb edge? (Include Photo)

Customer - Light levels

  • Is the customer home?

  • If the customer is home have they agreed to test the light levels at external wall box?

  • If agreed, what are the light levels at the the wall box? (Specification = between -15dbm and -25dbm)

Signature

  • Sign off by Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.