Title Page
-
Site conducted
-
Person conducting the audit
- Reece Martinez
- Daniel Bagalo
- Andreri Jitaru
- Leon Clarke
- Mantas Siciunas
- Mathew Nice
- Mihaita Serban
- Greg Siciunas
- Tyrone Davis
-
Gang being audited
-
Site Address
-
Live Location
-
Job Reference
-
Conducted on
-
Contract
-
Site risk assessment (Point of Work Risk Assessment)
-
Stop works immediately
Signing Lighting & Guarding
-
please provide supporting evidence such as annotated photo’s and notes
-
Are Courtesy Boards displayed?
-
Please ensure the correct permit number is displayed on a board this is MANDATORY and all sites MUST COMPLY
-
Photo evidence required
-
Is there enough Permit boards for the length as we require more than one if site longer than 50m
-
Is the correct permit number clearly visible and are works compliant to permit conditions?
-
Do Adequate advance warning signs exist?
-
Photo evidence required
-
Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?
Barriers and Work Area
-
Are all Barriers set up correctly as per the red Book?
-
Have sand bags been used on Cones with Signs, Barriers?
-
Is all the working equipment contained within the barriered work area (Including materials / spoil)?
-
Site tidiness (Housekeeping) - is site free of trip hazards (best as Possible)?
-
Are materials segregated and not contaminated?
-
Is the van parked in a safe position and accessible to the team? Surrounded by cones and signs?
Footways
-
Are footway Boards / Ramps fitted with rubber edging and fixed?
-
Are Footway Closed signs in use
-
Are pedestrian arrows in place and correctly fitted
-
Is the pedestrian walkway the correct width (At least 1.2m)
-
Is there a safe method for pedestrians to avoid the road / Carriageway whilst passing works?
-
Have all relevant provisions been made for people with disability? (wheelchair access, tapping rails)
-
Are permit conditions followed?
Carriageways
-
Is there minimum carriageway width maintained?
-
Is the Traffic Management method suitable for the type of road?
-
Are we using road crossing ramp or carriageway boards
-
Is sufficient safety zone set up?
Excavation
-
Is the duct depth at the correct level, as per specification?
-
Correct backfill material been used as per specification?
-
Chambers drilled as per specification?
-
Backfill compacted to specification?
Reinstatement
-
Excavation prepared for reinstatement?
-
150mm Rule Footway?
-
250mm Rule Carriageway?
-
90 Degree cuts?
-
Compaction and base?
-
Slabs/Blocks in good condition? Not chipped or cracked.
PPE
-
Fire retardant clothing worn by operatives?
-
Safety boots worn by operatives?
-
Hard Hats?
-
Safety Glasses?
-
FFP3 dust mask?
-
Ear defenders?
-
Gloves?
Health and safety
-
Utility Prints on site and in date?
-
First Aid Kit?
-
Eyewash?
-
Spill Kit?
-
Fire Extinguisher?
-
Insulated Tools?
-
All equipment in good condition and fit for purpose?
-
Cat, Genny, on site and Calibrated?
-
GDU on site in date calibration sticker attached.
-
Green marker tape with metal strip in tape.
Outcome
-
Any other issues or concerns raised not mentioned above?
-
Inspectors signature
-
Ganger signature