Information

  • Document No.

  • Caveside P.M. Checklist

  • Conducted on

  • Prepared by

External

  • Is valve pit secure and in good condition?

  • Is building/ gutters in good condition?

  • Is access track in good condition?

  • Have weeds been controlled?

  • Is intake screen free of obstructions?

  • Is earth stake connected and in good condition?

Internal

  • Is the area clean and tidy?

  • Are pipes and fittings free of leaks and corrosion?

  • Are fire extinguishers and hoses in good operational condition?

  • Are all lights and electrical fittings in good condition?

Valves and fittings.

  • Is the pressure relief valve operational?

  • Do both pressure gauges read the same?

  • Are all proximity switches in good condition?

Turbine pumps

  • Have pumps had grease applied as per schedule?

  • Are bearing temperatures with parameters?

  • Pump 1 Hours

  • Pump 2 Hours

  • Pump 1 KWh

  • Pump 2 kWh.

  • Flow meter reading.

  • Comments

  • Add media

Wet well.

  • Is wet well free of debris and silt?

  • Wet well depth measurement from underside of cover.

  • Comments

Completed by

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.