Information
-
Document No.
-
Audit Title Stoneycroft P.M. Checklist
-
Conducted on
-
Prepared by
External
-
Is building/ gutters in good condition?
-
Is access track in good condition?
-
Have weeds been controlled?
-
Has PSV at Liffey Holding Dam been checked?
-
Is intake screen free of obstructions?
-
Is earth stake connected and in good condition?
Internal
-
Is the area clean and tidy?
-
Are pipes and fittings free of leaks and corrosion?
-
Are fire extinguishers and hoses in good operational condition?
-
Are all lights and electrical fittings in good condition?
Valves and fittings.
-
Is the pressure relief valve operational?
-
Do both pressure gauges read the same?
-
Are all proximity switches in good condition?
Turbine pumps
-
Have pumps had grease applied, 200 hrs for pump, 1000 hours for motor?
-
Are bearing temperatures with parameters?
-
Pump 1 Hours
-
Pump 2 Hours
-
Pump 1 KWh
-
Pump 2 kWh.
-
Flow meter reading.
-
Comments
-
Add media
Wet well.
-
Is wet well free of debris and silt?
-
Wet well depth measurement from underside of cover.
-
Comments
Completed by
-
Add signature